Matches in DBpedia 2015-04 for { <http://dbpedia.org/resource/Tinker_Dam> ?p ?o }
Showing triples 1 to 34 of
34
with 100 triples per page.
- Tinker_Dam abstract "The Tinker Dam is a hydroelectric dam built on the Aroostook River in the Canadian province of New Brunswick and operated jointly by WPS Energy and NB Power. Its power house has a capacity of 34 megawatts.The dam and power house are collectively known as the Tinker Generating Station. The dam is located in Aroostook Junction, New Brunswick, immediately downstream of Fort Fairfield, Maine, and less than 1 km east of the Canada–United States border. The reservoir floods the Aroostook River valley into a portion of northeastern Maine. The dam was built in 1923 and the power house contains 5 hydroelectric units (1-5) which were placed in service between 1923-1965.The Tinker Generating Station benefits from flow regulation upstream in Maine on Millinocket Lake and on the Aroostook River in Squa Pan. There are also control facilities and a power house canal located on the Maine side of the border.The Tinker Generating Station was constructed as a joint project of the New Brunswick Electric Power Commission and the Maine Public Service. In 1999, the Maine Public Service sold its share of the plant to WPS Power Development, LLC of De Pere, Wisconsin. WPS Power Development operates in Canada under its subsidiary WPS Canada Generation, Inc.The dam spans the river between Andover Parish on the south side, and Grand Falls Parish on the north side, both in Victoria County.".
- Tinker_Dam wikiPageExternalLink www.nbpower.com.
- Tinker_Dam wikiPageExternalLink tinker.pdf.
- Tinker_Dam wikiPageID "9892751".
- Tinker_Dam wikiPageRevisionID "571620824".
- Tinker_Dam hasPhotoCollection Tinker_Dam.
- Tinker_Dam subject Category:Buildings_and_structures_in_Victoria_County,_New_Brunswick.
- Tinker_Dam subject Category:Dams_completed_in_1923.
- Tinker_Dam subject Category:Dams_in_New_Brunswick.
- Tinker_Dam subject Category:Hydroelectric_power_stations_in_New_Brunswick.
- Tinker_Dam subject Category:NB_Power.
- Tinker_Dam type Artifact100021939.
- Tinker_Dam type Barrier102796623.
- Tinker_Dam type Dam103160309.
- Tinker_Dam type DamsInNewBrunswick.
- Tinker_Dam type Facility103315023.
- Tinker_Dam type HydroelectricPowerStationsInNewBrunswick.
- Tinker_Dam type Object100002684.
- Tinker_Dam type Obstruction103839993.
- Tinker_Dam type PhysicalEntity100001930.
- Tinker_Dam type PowerStation103996655.
- Tinker_Dam type Station104306080.
- Tinker_Dam type Structure104341686.
- Tinker_Dam type Whole100003553.
- Tinker_Dam type YagoGeoEntity.
- Tinker_Dam type YagoPermanentlyLocatedEntity.
- Tinker_Dam comment "The Tinker Dam is a hydroelectric dam built on the Aroostook River in the Canadian province of New Brunswick and operated jointly by WPS Energy and NB Power. Its power house has a capacity of 34 megawatts.The dam and power house are collectively known as the Tinker Generating Station. The dam is located in Aroostook Junction, New Brunswick, immediately downstream of Fort Fairfield, Maine, and less than 1 km east of the Canada–United States border.".
- Tinker_Dam label "Tinker Dam".
- Tinker_Dam sameAs m.02pw3m4.
- Tinker_Dam sameAs Q7808319.
- Tinker_Dam sameAs Q7808319.
- Tinker_Dam sameAs Tinker_Dam.
- Tinker_Dam wasDerivedFrom Tinker_Dam?oldid=571620824.
- Tinker_Dam isPrimaryTopicOf Tinker_Dam.