Matches in DBpedia 2015-04 for { <http://dbpedia.org/resource/Reventaz%C3%B3n_Dam> ?p ?o }
Showing triples 1 to 58 of
58
with 100 triples per page.
- Reventaz%C3%B3n_Dam abstract "The Reventazón Dam is a concrete-face rock-fill dam currently being constructed on the Reventazón River about 8 km (5.0 mi) southwest of Siquirres in Limón Province, Costa Rica. The primary purpose of the dam is hydroelectric power production and its power station will have an installed capacity of 296 MW, the largest in the country. Construction on the dam began in 2009 and it is expected to be complete in 2016. At a height of 130 m (430 ft) and with a structural volume of 9,000,000 m3 (12,000,000 cu yd), it will be the largest dam in Central America. To produce electricity, water from the reservoir is diverted about 3 km (1.9 mi) to the northeast where it reaches the power station along the Reventazón River.".
- Reventaz%C3%B3n_Dam wikiPageID "44789221".
- Reventaz%C3%B3n_Dam wikiPageRevisionID "639025612".
- Reventaz%C3%B3n_Dam constructionBegan "2009".
- Reventaz%C3%B3n_Dam coordinatesDisplay "inline,title".
- Reventaz%C3%B3n_Dam coordinatesType "type:landmark".
- Reventaz%C3%B3n_Dam country "Costa Rica".
- Reventaz%C3%B3n_Dam damCrosses Reventaz%C3%B3n_River.
- Reventaz%C3%B3n_Dam damType "Embankment, concrete-face rock-fill".
- Reventaz%C3%B3n_Dam latD "10".
- Reventaz%C3%B3n_Dam latM "3".
- Reventaz%C3%B3n_Dam latNs "N".
- Reventaz%C3%B3n_Dam latS "56.05".
- Reventaz%C3%B3n_Dam location Lim%C3%B3n_Province.
- Reventaz%C3%B3n_Dam location Siquirres.
- Reventaz%C3%B3n_Dam locationMap "Costa Rica".
- Reventaz%C3%B3n_Dam longD "83".
- Reventaz%C3%B3n_Dam longEw "W".
- Reventaz%C3%B3n_Dam longM "34".
- Reventaz%C3%B3n_Dam longS "48.79".
- Reventaz%C3%B3n_Dam name "Reventazón Dam".
- Reventaz%C3%B3n_Dam opening "2016".
- Reventaz%C3%B3n_Dam owner Instituto_Costarricense_de_Electricidad.
- Reventaz%C3%B3n_Dam plantCapacity "296.0".
- Reventaz%C3%B3n_Dam plantCommission "2016".
- Reventaz%C3%B3n_Dam plantLatD "10".
- Reventaz%C3%B3n_Dam plantLatM "4".
- Reventaz%C3%B3n_Dam plantLatNs "N".
- Reventaz%C3%B3n_Dam plantLatS "59.82".
- Reventaz%C3%B3n_Dam plantLongD "83".
- Reventaz%C3%B3n_Dam plantLongEw "W".
- Reventaz%C3%B3n_Dam plantLongM "33".
- Reventaz%C3%B3n_Dam plantLongS "40.95".
- Reventaz%C3%B3n_Dam plantName "Reventazón Hydropower Plant".
- Reventaz%C3%B3n_Dam plantTurbines "3".
- Reventaz%C3%B3n_Dam plantType "Conventional, diversion".
- Reventaz%C3%B3n_Dam purpose "Power".
- Reventaz%C3%B3n_Dam status "UC".
- Reventaz%C3%B3n_Dam subject Category:Buildings_and_structures_in_Lim%C3%B3n_Province.
- Reventaz%C3%B3n_Dam subject Category:Concrete-face_rock-fill_dams.
- Reventaz%C3%B3n_Dam subject Category:Dams_in_Costa_Rica.
- Reventaz%C3%B3n_Dam subject Category:Dams_under_construction.
- Reventaz%C3%B3n_Dam subject Category:Energy_infrastructure_under_construction.
- Reventaz%C3%B3n_Dam subject Category:Hydroelectric_power_stations_in_Costa_Rica.
- Reventaz%C3%B3n_Dam subject Category:Proposed_hydroelectric_power_stations.
- Reventaz%C3%B3n_Dam type ArchitecturalStructure.
- Reventaz%C3%B3n_Dam type Dam.
- Reventaz%C3%B3n_Dam type Infrastructure.
- Reventaz%C3%B3n_Dam type Place.
- Reventaz%C3%B3n_Dam type Location.
- Reventaz%C3%B3n_Dam type Place.
- Reventaz%C3%B3n_Dam type Thing.
- Reventaz%C3%B3n_Dam type Q12323.
- Reventaz%C3%B3n_Dam comment "The Reventazón Dam is a concrete-face rock-fill dam currently being constructed on the Reventazón River about 8 km (5.0 mi) southwest of Siquirres in Limón Province, Costa Rica. The primary purpose of the dam is hydroelectric power production and its power station will have an installed capacity of 296 MW, the largest in the country. Construction on the dam began in 2009 and it is expected to be complete in 2016.".
- Reventaz%C3%B3n_Dam label "Reventazón Dam".
- Reventaz%C3%B3n_Dam sameAs m.012hmv61.
- Reventaz%C3%B3n_Dam wasDerivedFrom Reventazón_Dam?oldid=639025612.
- Reventaz%C3%B3n_Dam isPrimaryTopicOf Reventazón_Dam.