Matches in DBpedia 2015-04 for { <http://dbpedia.org/resource/Line_1,_Chongqing_Rail_Transit> ?p ?o }
Showing triples 1 to 74 of
74
with 100 triples per page.
- Line_1,_Chongqing_Rail_Transit abstract "Line 1 of Chongqing Rail Transit runs westwards from Chaotianmen to Daxuecheng. Line 1 begin operation on 28 July 2011.Line 1 runs 16.4 km (10.2 mi) from Chaotianmen in downtown Chongqing west to Shapingba, and eventually all the way to Shuangbei for a total length of 22.4 km (13.9 mi). It is the city's first all-heavy rail subway line and the second completed in Western China. Passenger capacity of the line is 36,000 passengers/hour/direction. In 1992, the Chongqing government had signed a Build-Operate-Transfer in 1992 with a Hong Kong company, and provided the land for the project, but work ceased in 1997 due to legal issues. Work resumed on the first stretch of the line (from Chaotianmen to Shapingba) on 9 June 2007, and opened to limited operation on July 28. An extension from Shapingba to Daxuecheng (University Town) began in 2009 and opened on December 21, 2012.Line 1 has 14 stations, including from east to west: Chaotianmen, Xiaoshizi, Jiaochangkou, Qixinggang, Lianglukou, Eling, Daping, Shiyoulu, Xietaizi, Shiqiaopu, Gaomiaocun, Majiayan, Xiaolongkan, and Shapingba stations. Lieshimu, Ciqikou, Shuangpingnan, Shuangpingbei, Laijiaqiao, Tuzhu, Huxi, Daxuecheng (University Town), and Jiandingpo stations are scheduled to open in 2013 once the Phase 2 extension of Line 1 is complete.Line 1 has transfer interchange stations with Line 2 at Jiaochangkou in Jeifangbei CBD and at Daping. Line 1 will have transfer station when Line 3 opens later in 2011 at Lianglukou, near the Chongqing Railway Station in the Caiyuanba section of central Yuzhong.".
- Line_1,_Chongqing_Rail_Transit isPartOf Chongqing_Rail_Transit.
- Line_1,_Chongqing_Rail_Transit numberOfStations "23".
- Line_1,_Chongqing_Rail_Transit openingDate "2011-07-28".
- Line_1,_Chongqing_Rail_Transit openingYear "2011".
- Line_1,_Chongqing_Rail_Transit passengersPerDay "574000".
- Line_1,_Chongqing_Rail_Transit routeEnd Daxuecheng_Station_(Chongqing).
- Line_1,_Chongqing_Rail_Transit routeStart Chaotianmen_Station.
- Line_1,_Chongqing_Rail_Transit thumbnail 重庆市轨道交通一号线较场口站.jpg?width=300.
- Line_1,_Chongqing_Rail_Transit type Rapid_transit.
- Line_1,_Chongqing_Rail_Transit wikiPageID "32569578".
- Line_1,_Chongqing_Rail_Transit wikiPageRevisionID "645855294".
- Line_1,_Chongqing_Rail_Transit end Daxuecheng_Station_(Chongqing).
- Line_1,_Chongqing_Rail_Transit hasPhotoCollection Line_1,_Chongqing_Rail_Transit.
- Line_1,_Chongqing_Rail_Transit imageWidth "265".
- Line_1,_Chongqing_Rail_Transit labels "no".
- Line_1,_Chongqing_Rail_Transit map "250".
- Line_1,_Chongqing_Rail_Transit mapState "collapsed".
- Line_1,_Chongqing_Rail_Transit open "2011-07-28".
- Line_1,_Chongqing_Rail_Transit operator "Chongqing Rail Transit Corp., Ltd".
- Line_1,_Chongqing_Rail_Transit ridership "574000".
- Line_1,_Chongqing_Rail_Transit s "七星岗".
- Line_1,_Chongqing_Rail_Transit s "两路口".
- Line_1,_Chongqing_Rail_Transit s "双碑".
- Line_1,_Chongqing_Rail_Transit s "团山堡".
- Line_1,_Chongqing_Rail_Transit s "大坪".
- Line_1,_Chongqing_Rail_Transit s "大学城".
- Line_1,_Chongqing_Rail_Transit s "小什字".
- Line_1,_Chongqing_Rail_Transit s "小龙坎".
- Line_1,_Chongqing_Rail_Transit s "尖顶坡".
- Line_1,_Chongqing_Rail_Transit s "微电园".
- Line_1,_Chongqing_Rail_Transit s "朝天门".
- Line_1,_Chongqing_Rail_Transit s "杨公桥".
- Line_1,_Chongqing_Rail_Transit s "歇台子".
- Line_1,_Chongqing_Rail_Transit s "沙坪坝".
- Line_1,_Chongqing_Rail_Transit s "烈士墓".
- Line_1,_Chongqing_Rail_Transit s "璧山城北".
- Line_1,_Chongqing_Rail_Transit s "璧山青杠".
- Line_1,_Chongqing_Rail_Transit s "石井坡".
- Line_1,_Chongqing_Rail_Transit s "石桥铺".
- Line_1,_Chongqing_Rail_Transit s "石油路".
- Line_1,_Chongqing_Rail_Transit s "磁器口".
- Line_1,_Chongqing_Rail_Transit s "秀湖公园".
- Line_1,_Chongqing_Rail_Transit s "赖家桥".
- Line_1,_Chongqing_Rail_Transit s "较场口".
- Line_1,_Chongqing_Rail_Transit s "陈家桥".
- Line_1,_Chongqing_Rail_Transit s "马家岩".
- Line_1,_Chongqing_Rail_Transit s "高庙村".
- Line_1,_Chongqing_Rail_Transit s "鹅岭".
- Line_1,_Chongqing_Rail_Transit start Chaotianmen_Station.
- Line_1,_Chongqing_Rail_Transit stations "23".
- Line_1,_Chongqing_Rail_Transit system Chongqing_Rail_Transit.
- Line_1,_Chongqing_Rail_Transit type Rapid_transit.
- Line_1,_Chongqing_Rail_Transit subject Category:Chongqing_Rail_Transit.
- Line_1,_Chongqing_Rail_Transit subject Category:Railway_lines_opened_in_2011.
- Line_1,_Chongqing_Rail_Transit type ArchitecturalStructure.
- Line_1,_Chongqing_Rail_Transit type Infrastructure.
- Line_1,_Chongqing_Rail_Transit type Place.
- Line_1,_Chongqing_Rail_Transit type RailwayLine.
- Line_1,_Chongqing_Rail_Transit type RouteOfTransportation.
- Line_1,_Chongqing_Rail_Transit type Location.
- Line_1,_Chongqing_Rail_Transit type Place.
- Line_1,_Chongqing_Rail_Transit type Thing.
- Line_1,_Chongqing_Rail_Transit type Q728937.
- Line_1,_Chongqing_Rail_Transit comment "Line 1 of Chongqing Rail Transit runs westwards from Chaotianmen to Daxuecheng. Line 1 begin operation on 28 July 2011.Line 1 runs 16.4 km (10.2 mi) from Chaotianmen in downtown Chongqing west to Shapingba, and eventually all the way to Shuangbei for a total length of 22.4 km (13.9 mi). It is the city's first all-heavy rail subway line and the second completed in Western China. Passenger capacity of the line is 36,000 passengers/hour/direction.".
- Line_1,_Chongqing_Rail_Transit label "Line 1, Chongqing Rail Transit".
- Line_1,_Chongqing_Rail_Transit label "重慶軌道交通1号線".
- Line_1,_Chongqing_Rail_Transit sameAs 重慶軌道交通1号線.
- Line_1,_Chongqing_Rail_Transit sameAs m.0h1c6dg.
- Line_1,_Chongqing_Rail_Transit sameAs Q263572.
- Line_1,_Chongqing_Rail_Transit sameAs Q263572.
- Line_1,_Chongqing_Rail_Transit wasDerivedFrom Line_1,_Chongqing_Rail_Transit?oldid=645855294.
- Line_1,_Chongqing_Rail_Transit depiction 重庆市轨道交通一号线较场口站.jpg.
- Line_1,_Chongqing_Rail_Transit isPrimaryTopicOf Line_1,_Chongqing_Rail_Transit.