- HVDC_Leyte%E2%80%93Luzon abstract "The HVDC Leyte–Luzon is a high voltage direct current transmission link in the Philippines between geothermal power plants on the island of Leyte and the southern part of island of Luzon. The HVDC Leyte – Luzon went in service on 10 August 1998.The HVDC Leyte – Luzon begins at Ormoc converter station (Leyte Province) and ends at Naga converter station (Province of Camarines Sur). It consists three sections: Leyte-Samar overhead line submarine cables across San Bernardino Strait between Cabacungan (Allen, Samar) and Sta Magdalena (Sorsogon Province, Luzon) overhead line at LuzonThe length of submarine cable is 21 kilometres (13 mi) and the total length of overhead lines is 430 kilometres (270 mi). The HVDC Leyte – Luzon can transfer an output of 440 MW. It is implemented as monopolar line for a voltage of 350 kV.The crossing of San Juanico Strait is realized as overhead crossing with a tower on an island in the strait.Aim of the HVDC link is to feed the AC grid in the Manila region. Beside of overall connection of grids, the HVDC Leyte – Luzon stabilize the AC network. The interconnector is manufactured by the ABB Group in cooperation with Marubeni Corporation and it's operated by state owned National Transmission Corporation.The grounding electrodes are situated at Albuera at 10°54′01″N 124°42′24″E and near Calabanga at 13°43′59″N 123°14′29″E . They are connected with the converter stations by 25 respecitively 15 kilometres long overhead lines.".
- HVDC_Leyte%E2%80%93Luzon wikiPageExternalLink ABBLibrary.asp?DocumentID=POW-0021&LanguageCode=en&DocumentPartID=&Action=Launch.
- HVDC_Leyte%E2%80%93Luzon wikiPageExternalLink LEYTE.htm.
- HVDC_Leyte%E2%80%93Luzon wikiPageExternalLink c1256d71001e0037c125683400221c89.aspx.
- HVDC_Leyte%E2%80%93Luzon wikiPageExternalLink p129.htm.
- HVDC_Leyte%E2%80%93Luzon wikiPageID "1666226".
- HVDC_Leyte%E2%80%93Luzon wikiPageRevisionID "551263124".
- HVDC_Leyte%E2%80%93Luzon cableInstaller ABB_Group.
- HVDC_Leyte%E2%80%93Luzon cableManufacturer ABB_Group.
- HVDC_Leyte%E2%80%93Luzon capacity "440.0".
- HVDC_Leyte%E2%80%93Luzon country "The Philippines".
- HVDC_Leyte%E2%80%93Luzon currentType High-voltage_direct_current.
- HVDC_Leyte%E2%80%93Luzon dcVoltage "350.0".
- HVDC_Leyte%E2%80%93Luzon est "1998-08-10".
- HVDC_Leyte%E2%80%93Luzon finish Luzon.
- HVDC_Leyte%E2%80%93Luzon hasPhotoCollection HVDC_Leyte–Luzon.
- HVDC_Leyte%E2%80%93Luzon length "451".
- HVDC_Leyte%E2%80%93Luzon name "HVDC Leyte–Luzon".
- HVDC_Leyte%E2%80%93Luzon operator National_Transmission_Corporation.
- HVDC_Leyte%E2%80%93Luzon polesNo "1".
- HVDC_Leyte%E2%80%93Luzon province Camarines_Sur.
- HVDC_Leyte%E2%80%93Luzon province Leyte_(province).
- HVDC_Leyte%E2%80%93Luzon province Sorsogon.
- HVDC_Leyte%E2%80%93Luzon start Leyte.
- HVDC_Leyte%E2%80%93Luzon substationInstaller ABB_Group.
- HVDC_Leyte%E2%80%93Luzon substationManufacturer ABB_Group.
- HVDC_Leyte%E2%80%93Luzon through San_Juanico_Strait.
- HVDC_Leyte%E2%80%93Luzon subject Category:Electric_power_infrastructure_in_the_Philippines.
- HVDC_Leyte%E2%80%93Luzon subject Category:HVDC_transmission_lines.
- HVDC_Leyte%E2%80%93Luzon subject Category:Submarine_power_cables.
- HVDC_Leyte%E2%80%93Luzon type Artifact100021939.
- HVDC_Leyte%E2%80%93Luzon type Cable102934168.
- HVDC_Leyte%E2%80%93Luzon type Conductor103088707.
- HVDC_Leyte%E2%80%93Luzon type Device103183080.
- HVDC_Leyte%E2%80%93Luzon type HVDCTransmissionLines.
- HVDC_Leyte%E2%80%93Luzon type Instrumentality103575240.
- HVDC_Leyte%E2%80%93Luzon type Object100002684.
- HVDC_Leyte%E2%80%93Luzon type PhysicalEntity100001930.
- HVDC_Leyte%E2%80%93Luzon type PowerLine103995535.
- HVDC_Leyte%E2%80%93Luzon type SubmarinePowerCables.
- HVDC_Leyte%E2%80%93Luzon type Whole100003553.
- HVDC_Leyte%E2%80%93Luzon comment "The HVDC Leyte–Luzon is a high voltage direct current transmission link in the Philippines between geothermal power plants on the island of Leyte and the southern part of island of Luzon. The HVDC Leyte – Luzon went in service on 10 August 1998.The HVDC Leyte – Luzon begins at Ormoc converter station (Leyte Province) and ends at Naga converter station (Province of Camarines Sur).".
- HVDC_Leyte%E2%80%93Luzon label "HVDC Leyte–Luzon".
- HVDC_Leyte%E2%80%93Luzon label "Высоковольтная линия постоянного тока Лейте-Лусон".
- HVDC_Leyte%E2%80%93Luzon sameAs m.05lwfy.
- HVDC_Leyte%E2%80%93Luzon sameAs HVDC_Leyte–Luzon.
- HVDC_Leyte%E2%80%93Luzon wasDerivedFrom HVDC_Leyte–Luzon?oldid=551263124.
- HVDC_Leyte%E2%80%93Luzon isPrimaryTopicOf HVDC_Leyte–Luzon.