Matches in DBpedia 2015-04 for { <http://dbpedia.org/resource/Gray_County_Wind_Farm> ?p ?o }
Showing triples 1 to 28 of
28
with 100 triples per page.
- Gray_County_Wind_Farm abstract "Gray County Wind Farm near Montezuma, Kansas is the largest wind farm in Kansas and the largest in the United States not mandated by a state regulatory commission. The site consists of 170 Vestas V-47 wind turbines with a total nameplate capacity of 112 MW. Each turbine tower is 217 feet high, with blades 77 feet long, and a generating capacity of 660 kW. Owned and operated by NextEra Energy Resources, Gray County Wind Farm became fully operational in November 2001. Its construction cost an estimated $100 million. The average wind speed at the site is approximately 20 mph. The area is primarily used for farmland.".
- Gray_County_Wind_Farm wikiPageExternalLink graycounty.shtml.
- Gray_County_Wind_Farm wikiPageID "5162533".
- Gray_County_Wind_Farm wikiPageRevisionID "522434737".
- Gray_County_Wind_Farm hasPhotoCollection Gray_County_Wind_Farm.
- Gray_County_Wind_Farm subject Category:Buildings_and_structures_in_Gray_County,_Kansas.
- Gray_County_Wind_Farm subject Category:Energy_infrastructure_completed_in_2001.
- Gray_County_Wind_Farm subject Category:Wind_farms_in_Kansas.
- Gray_County_Wind_Farm type Artifact100021939.
- Gray_County_Wind_Farm type EnergyResourceFacilitiesInKansas.
- Gray_County_Wind_Farm type Facility103315023.
- Gray_County_Wind_Farm type Object100002684.
- Gray_County_Wind_Farm type PhysicalEntity100001930.
- Gray_County_Wind_Farm type PowerStation103996655.
- Gray_County_Wind_Farm type Station104306080.
- Gray_County_Wind_Farm type Whole100003553.
- Gray_County_Wind_Farm type WindFarm104586761.
- Gray_County_Wind_Farm type WindFarmsInKansas.
- Gray_County_Wind_Farm type YagoGeoEntity.
- Gray_County_Wind_Farm type YagoPermanentlyLocatedEntity.
- Gray_County_Wind_Farm comment "Gray County Wind Farm near Montezuma, Kansas is the largest wind farm in Kansas and the largest in the United States not mandated by a state regulatory commission. The site consists of 170 Vestas V-47 wind turbines with a total nameplate capacity of 112 MW. Each turbine tower is 217 feet high, with blades 77 feet long, and a generating capacity of 660 kW. Owned and operated by NextEra Energy Resources, Gray County Wind Farm became fully operational in November 2001.".
- Gray_County_Wind_Farm label "Gray County Wind Farm".
- Gray_County_Wind_Farm sameAs m.0d5pzq.
- Gray_County_Wind_Farm sameAs Q5598166.
- Gray_County_Wind_Farm sameAs Q5598166.
- Gray_County_Wind_Farm sameAs Gray_County_Wind_Farm.
- Gray_County_Wind_Farm wasDerivedFrom Gray_County_Wind_Farm?oldid=522434737.
- Gray_County_Wind_Farm isPrimaryTopicOf Gray_County_Wind_Farm.