- Col%C3%ADder_Dam abstract "The Colíder Dam is a rock-fill dam with an asphalt-concrete core, currently under construction on the Teles Pires river about 40 km (25 mi) southeast of Colíder in the state of Mato Grosso, Brazil. The dam's hydroelectric power stations will have 3 turbines each 115 MW resulting in a total installed capacity of 306.9 MW. Construction on the run-of-the-river type station was initiated in May 2011, and is expected to be operational in 2015.The dam is part of a planned six power plant "Hidrovia Tapajos/Teles Pires" project to create a navigable waterway connecting the interior of Brazil to the Atlantic Ocean. The waterway will consist of five dams on the Teles Pires river (53 megawatts (71,000 hp) Magessi Dam, 430 megawatts (580,000 hp) Sinop Dam, 342 megawatts (459,000 hp) Colíder Dam, 1,820 megawatts (2,440,000 hp) Teles Pires Dam, 746 megawatts (1,000,000 hp) Sao Manoel Dam) and the 230 megawatts (310,000 hp) Foz do Apiacas Dam on the Apiacas river.The Colíder Dam and the Teles Pires Dam are currently under construction, while the smaller upstream dams are still in the planning stages.".
- Col%C3%ADder_Dam wikiPageExternalLink uhecolider.
- Col%C3%ADder_Dam wikiPageID "44903845".
- Col%C3%ADder_Dam wikiPageRevisionID "641089165".
- Col%C3%ADder_Dam constructionBegan "2011-05-15".
- Col%C3%ADder_Dam coordinatesDisplay "inline,title".
- Col%C3%ADder_Dam coordinatesType "type:landmark".
- Col%C3%ADder_Dam cost "US$1 billion".
- Col%C3%ADder_Dam damCrosses "Teles Pires river".
- Col%C3%ADder_Dam damOperator Copel.
- Col%C3%ADder_Dam damType "Embankment, concrete gravity composite".
- Col%C3%ADder_Dam imageCaption "Site of the Colíder Dam".
- Col%C3%ADder_Dam latD "10".
- Col%C3%ADder_Dam latM "59".
- Col%C3%ADder_Dam latNs "S".
- Col%C3%ADder_Dam latS "6.6".
- Col%C3%ADder_Dam location "Colíder, Mato Grosso, Brazil".
- Col%C3%ADder_Dam locationMap "Brazil".
- Col%C3%ADder_Dam locationMapCaption "Location of the Colíder Dam in Brazil".
- Col%C3%ADder_Dam longD "55".
- Col%C3%ADder_Dam longEw "W".
- Col%C3%ADder_Dam longM "46".
- Col%C3%ADder_Dam longS "30.39".
- Col%C3%ADder_Dam maxCapacity "306.9".
- Col%C3%ADder_Dam name "Colíder Dam".
- Col%C3%ADder_Dam nameOfficial "Usina Hidrelétrica Colíder".
- Col%C3%ADder_Dam opening "2015".
- Col%C3%ADder_Dam plantCommission "2015".
- Col%C3%ADder_Dam plantOwner "Companhia Paranaense de Energia - COPEL".
- Col%C3%ADder_Dam plantTurbines "3".
- Col%C3%ADder_Dam plantType Run-of-the-river_hydroelectricity.
- Col%C3%ADder_Dam purpose "Power".
- Col%C3%ADder_Dam spillwayType "Overflow, 1 controlled gates".
- Col%C3%ADder_Dam status "Under construction".
- Col%C3%ADder_Dam website uhecolider.
- Col%C3%ADder_Dam subject Category:Buildings_and_structures_in_Mato_Grosso.
- Col%C3%ADder_Dam subject Category:Dams_in_Brazil.
- Col%C3%ADder_Dam subject Category:Dams_under_construction.
- Col%C3%ADder_Dam subject Category:Hydroelectric_power_stations_in_Brazil.
- Col%C3%ADder_Dam subject Category:Rock-filled_dams.
- Col%C3%ADder_Dam subject Category:Run-of-the-river_power_stations.
- Col%C3%ADder_Dam type ArchitecturalStructure.
- Col%C3%ADder_Dam type Dam.
- Col%C3%ADder_Dam type Infrastructure.
- Col%C3%ADder_Dam type Place.
- Col%C3%ADder_Dam type Location.
- Col%C3%ADder_Dam type Place.
- Col%C3%ADder_Dam type Thing.
- Col%C3%ADder_Dam type Q12323.
- Col%C3%ADder_Dam comment "The Colíder Dam is a rock-fill dam with an asphalt-concrete core, currently under construction on the Teles Pires river about 40 km (25 mi) southeast of Colíder in the state of Mato Grosso, Brazil. The dam's hydroelectric power stations will have 3 turbines each 115 MW resulting in a total installed capacity of 306.9 MW.".
- Col%C3%ADder_Dam label "Colíder Dam".
- Col%C3%ADder_Dam sameAs m.012kxbfs.
- Col%C3%ADder_Dam wasDerivedFrom Colíder_Dam?oldid=641089165.
- Col%C3%ADder_Dam homepage uhecolider.
- Col%C3%ADder_Dam isPrimaryTopicOf Colíder_Dam.