Matches in DBpedia 2015-04 for { <http://dbpedia.org/resource/CLR_1_to_8> ?p ?o }
Showing triples 1 to 34 of
34
with 100 triples per page.
- CLR_1_to_8 abstract "Cavan and Leitrim Railway 1 to 8 were 4-4-0T locomotives built by Robert Stephenson and Company, and were the first locomotives on the C&LR. On the 1925 amalgamation, when the railway became part of the Great Southern Railways, they were designated Class 1L or Class DN2.The first section, some 34 miles, of what became the Cavan and Leitrim Railway (C&LR), from Dromod to Belturbet was opened in October 1887. The branch line from Ballinamore to Arigna followed in May 1888 and in 1920 extended to the coal mines beyond the village. The line was closed in May 1959, leaving only the West Clare Railway as the sole surviving narrow gauge line in Ireland. On opening the line had a fleet of 8 steam locomotives, numbered 1 to 8.".
- CLR_1_to_8 wikiPageExternalLink l_by_l.
- CLR_1_to_8 wikiPageExternalLink nj.html.
- CLR_1_to_8 wikiPageID "4624891".
- CLR_1_to_8 wikiPageRevisionID "637029935".
- CLR_1_to_8 builddate "1887".
- CLR_1_to_8 builder Robert_Stephenson_and_Company.
- CLR_1_to_8 cylindercount "Two".
- CLR_1_to_8 disposition "Two preserved, remainder scrapped".
- CLR_1_to_8 fueltype "Coal".
- CLR_1_to_8 hasPhotoCollection CLR_1_to_8.
- CLR_1_to_8 name "Cavan & Leitrim Railway".
- CLR_1_to_8 name "GSR class DN2".
- CLR_1_to_8 name "locomotives 1 to 8".
- CLR_1_to_8 operatorclass "GSR/CIÉ: 1L or DN2".
- CLR_1_to_8 powertype "Steam".
- CLR_1_to_8 preservedunits "Nos. 2 & 3".
- CLR_1_to_8 serialnumber "2612".
- CLR_1_to_8 totalproduction "8".
- CLR_1_to_8 uicclass "2".
- CLR_1_to_8 whytetype "4".
- CLR_1_to_8 withdrawndate "1925".
- CLR_1_to_8 subject Category:3_ft_gauge_locomotives.
- CLR_1_to_8 subject Category:4-4-0T_locomotives.
- CLR_1_to_8 subject Category:Railway_locomotives_introduced_in_1887.
- CLR_1_to_8 subject Category:Robert_Stephenson_and_Company_locomotives.
- CLR_1_to_8 subject Category:Steam_locomotives_of_Ireland.
- CLR_1_to_8 comment "Cavan and Leitrim Railway 1 to 8 were 4-4-0T locomotives built by Robert Stephenson and Company, and were the first locomotives on the C&LR. On the 1925 amalgamation, when the railway became part of the Great Southern Railways, they were designated Class 1L or Class DN2.The first section, some 34 miles, of what became the Cavan and Leitrim Railway (C&LR), from Dromod to Belturbet was opened in October 1887.".
- CLR_1_to_8 label "CLR 1 to 8".
- CLR_1_to_8 sameAs m.0cd7lb.
- CLR_1_to_8 sameAs Q5012792.
- CLR_1_to_8 sameAs Q5012792.
- CLR_1_to_8 wasDerivedFrom CLR_1_to_8?oldid=637029935.
- CLR_1_to_8 isPrimaryTopicOf CLR_1_to_8.