Matches in DBpedia 2015-10 for { <http://www.eswp.com/PDF/PE_summer05_16-18.pdf> ?p ?o }
Showing triples 1 to 21 of
21
with 100 triples per page.
- PE_summer05_16-18.pdf accessdate "2011-08-12".
- PE_summer05_16-18.pdf archivedate "2006-11-11".
- PE_summer05_16-18.pdf archiveurl PE_summer05_16-18.pdf.
- PE_summer05_16-18.pdf deadurl "no".
- PE_summer05_16-18.pdf first "David".
- PE_summer05_16-18.pdf first2 "Bonnie".
- PE_summer05_16-18.pdf first3 "Rob".
- PE_summer05_16-18.pdf format "PDF".
- PE_summer05_16-18.pdf isCitedBy Mike_OCallaghanxe2x80x93Pat_Tillman_Memorial_Bridge.
- PE_summer05_16-18.pdf journal "International Bridge Conference 2005".
- PE_summer05_16-18.pdf last "Goodyear".
- PE_summer05_16-18.pdf last2 "Klamerus".
- PE_summer05_16-18.pdf last3 "Turton".
- PE_summer05_16-18.pdf location "Pittsburgh".
- PE_summer05_16-18.pdf pages "16–18".
- PE_summer05_16-18.pdf publisher "Engineers' Society of Western Pennsylvania".
- PE_summer05_16-18.pdf quote "This will be the first arch structure of this scale to combine a composite steel deck with a segmental concrete arch and spandrels. The design is also unique in its use of steel Vierendeel struts between twin concrete arch ribs – a feature that both speeds construction and adds ductility to the lateral framing system for extreme seismic loads.".
- PE_summer05_16-18.pdf ref "harv".
- PE_summer05_16-18.pdf title "New Colorado River Arch Bridge at the Hoover Dam".
- PE_summer05_16-18.pdf url PE_summer05_16-18.pdf.
- PE_summer05_16-18.pdf year "2005".