Matches in DBpedia 2016-04 for { <http://www.thespacereview.com/article/1318/1> ?p ?o }
Showing triples 1 to 13 of
13
with 100 triples per page.
- 1 accessdate "2010-01-26".
- 1 accessdate "2012-08-04".
- 1 date "2009-03-02".
- 1 first "Adrian".
- 1 isCitedBy Mars_Science_Laboratory.
- 1 isCitedBy Timeline_of_Mars_Science_Laboratory.
- 1 last "Brown".
- 1 quote "NASA first put a reliable figure of the cost of the MSL mission at the "Phase A/Phase B transition", after a preliminary design review that approved instruments, design and engineering of the whole mission. That was in August 2006—and the Congress-approved figure was $1.63 billion. ... With this request, the MSL budget had reached $1.9 billion. ... NASA HQ requested JPL prepare an assessment of costs to complete the construction of MSL by the next launch opportunity . This figure came in around $300 million, and NASA HQ has estimated this will translate to at least $400 million , to launch MSL and operate it on the surface of Mars from 2012 through 2014.".
- 1 quote "NASA first put a reliable figure of the cost of the MSL mission at the "Phase A/Phase B transition", after a preliminary design review that approved instruments, design and engineering of the whole mission. That was in August 2006—and the Congress-approved figure was $1.63 billion. … With this request, the MSL budget had reached $1.9 billion. … NASA HQ requested JPL prepare an assessment of costs to complete the construction of MSL by the next launch opportunity . This figure came in around $300 million, and NASA HQ has estimated this will translate to at least $400 million , to launch MSL and operate it on the surface of Mars from 2012 through 2014.".
- 1 title "Mars Science Laboratory: the budgetary reasons behind its delay".