Matches in DBpedia 2016-04 for { <http://wikidata.dbpedia.org/resource/Q7516404> ?p ?o }
Showing triples 1 to 42 of
42
with 100 triples per page.
- Q7516404 subject Q8320155.
- Q7516404 subject Q8759681.
- Q7516404 subject Q8759728.
- Q7516404 subject Q9082585.
- Q7516404 abstract "The 250 MW Silver State South Solar Project is a photovoltaic power station which is being constructed by subcontractors for First Solar. Construction is expected to be complete in early 2016. The plant will be owned and operated by a subsidiary of NextEra Energy Resources, and power will be sold to Southern California Edison.The project occupies approximately 2,900 acres of public lands and is located adjacent to Primm, Nevada, in the Jean Lake/Roach Lake Special Recreation Management Area (SRMA).".
- Q7516404 buildingStartDate "September 3, 2014".
- Q7516404 buildingStartYear "2014".
- Q7516404 location Q108403.
- Q7516404 owner Q1138888.
- Q7516404 status "u".
- Q7516404 wikiPageExternalLink Silver_State_Solar_South.html.
- Q7516404 wikiPageWikiLink Q108403.
- Q7516404 wikiPageWikiLink Q1138888.
- Q7516404 wikiPageWikiLink Q1706317.
- Q7516404 wikiPageWikiLink Q192127.
- Q7516404 wikiPageWikiLink Q3339191.
- Q7516404 wikiPageWikiLink Q6634659.
- Q7516404 wikiPageWikiLink Q7556799.
- Q7516404 wikiPageWikiLink Q8320155.
- Q7516404 wikiPageWikiLink Q8759681.
- Q7516404 wikiPageWikiLink Q8759728.
- Q7516404 wikiPageWikiLink Q9082585.
- Q7516404 constructionBegan "2014-09-03".
- Q7516404 location Q108403.
- Q7516404 name "Silver State South Solar Project".
- Q7516404 owner Q1138888.
- Q7516404 status "u".
- Q7516404 point "35.63333333333333 -115.35".
- Q7516404 type Place.
- Q7516404 type ArchitecturalStructure.
- Q7516404 type Infrastructure.
- Q7516404 type Location.
- Q7516404 type Place.
- Q7516404 type PowerStation.
- Q7516404 type Thing.
- Q7516404 type SpatialThing.
- Q7516404 type Q159719.
- Q7516404 comment "The 250 MW Silver State South Solar Project is a photovoltaic power station which is being constructed by subcontractors for First Solar. Construction is expected to be complete in early 2016.".
- Q7516404 label "Silver State South Solar Project".
- Q7516404 lat "35.63333333333333".
- Q7516404 long "-115.35".
- Q7516404 name "Silver State South Solar Project".