Matches in DBpedia 2016-04 for { <http://wikidata.dbpedia.org/resource/Q6742089> ?p ?o }
Showing triples 1 to 43 of
43
with 100 triples per page.
- Q6742089 subject Q7157494.
- Q6742089 subject Q7344076.
- Q6742089 subject Q8312096.
- Q6742089 subject Q8602109.
- Q6742089 subject Q8778844.
- Q6742089 abstract "Malaysia–Singapore Third Crossing (Malay: Laluan Ketiga Malaysia–Singapura, Chinese: 第三通道), is a proposed bridge connecting Changi in Singapore and Pengerang in Johor, Malaysia. The Bridge would be constructed by Korean Construction Doosan Engineering and Construction Company in October 16, 2018 and finished in June 30, 2024.".
- Q6742089 bridgeCarries "Motor vehicles".
- Q6742089 builder Q486002.
- Q6742089 openingDate "2024-06-30".
- Q6742089 openingYear "2024".
- Q6742089 wikiPageWikiLink Q12280.
- Q6742089 wikiPageWikiLink Q18097.
- Q6742089 wikiPageWikiLink Q1812824.
- Q6742089 wikiPageWikiLink Q183032.
- Q6742089 wikiPageWikiLink Q334.
- Q6742089 wikiPageWikiLink Q486002.
- Q6742089 wikiPageWikiLink Q7157494.
- Q6742089 wikiPageWikiLink Q7162711.
- Q6742089 wikiPageWikiLink Q7344076.
- Q6742089 wikiPageWikiLink Q752870.
- Q6742089 wikiPageWikiLink Q8312096.
- Q6742089 wikiPageWikiLink Q833.
- Q6742089 wikiPageWikiLink Q8602109.
- Q6742089 wikiPageWikiLink Q8778844.
- Q6742089 bridgeName "Malaysia-Singapore Third Crossing".
- Q6742089 builder Q486002.
- Q6742089 carries Q752870.
- Q6742089 nativeName "Laluan Ketiga Malaysia-Singapura".
- Q6742089 officialName "Malaysia-Singapore Third Crossing".
- Q6742089 open "2024-06-30".
- Q6742089 type Place.
- Q6742089 type ArchitecturalStructure.
- Q6742089 type Bridge.
- Q6742089 type Infrastructure.
- Q6742089 type Location.
- Q6742089 type Place.
- Q6742089 type RouteOfTransportation.
- Q6742089 type Thing.
- Q6742089 type Q12280.
- Q6742089 comment "Malaysia–Singapore Third Crossing (Malay: Laluan Ketiga Malaysia–Singapura, Chinese: 第三通道), is a proposed bridge connecting Changi in Singapore and Pengerang in Johor, Malaysia. The Bridge would be constructed by Korean Construction Doosan Engineering and Construction Company in October 16, 2018 and finished in June 30, 2024.".
- Q6742089 label "Malaysia–Singapore Third Crossing".
- Q6742089 name "Laluan Ketiga Malaysia-Singapura".
- Q6742089 name "Malaysia-Singapore Third Crossing".