- Q6058630 abstract "The Intrepid Wind Farm consists of 107 wind turbines, located in Sac and Buena Vista counties in north-west Iowa, has a generating capacity of 160.5 megawatts of electricity. The wind power project is MidAmerican Energy Company’s first owned and operated wind generation facility and became operational on December 31, 2004.When MidAmerican Energy first began planning the Intrepid site, the company worked closely with several state and national environmental groups, with a view to minimizing the environmental impact. Using input from such diverse groups as the Iowa Department of Natural Resources, the Nature Conservancy, Iowa State University, the U.S. Fish and Wildlife Service, the Iowa Natural Heritage Foundation, and the Iowa Chapter of the Sierra Club, MidAmerican created a statewide map of areas in the proposed region that contained specific bird populations or habitats. Those areas were then avoided when detailed site planning occurred. MidAmerican also worked in conjunction with the Army Corp of Engineers, to secure all necessary permits related to any potential risk to wetlands in the area. Regular inspections are also conducted to make certain that the wind farm is causing no adverse environmental impact to the region.".
- Q6058630 country Q30.
- Q6058630 installedCapacity "1.605E8".
- Q6058630 location Q111957.
- Q6058630 location Q1546.
- Q6058630 location Q156639.
- Q6058630 operator Q6840876.
- Q6058630 owner Q6840876.
- Q6058630 status "Operational".
- Q6058630 wikiPageWikiLink Q111957.
- Q6058630 wikiPageWikiLink Q1136919.
- Q6058630 wikiPageWikiLink Q13306975.
- Q6058630 wikiPageWikiLink Q1546.
- Q6058630 wikiPageWikiLink Q156639.
- Q6058630 wikiPageWikiLink Q170321.
- Q6058630 wikiPageWikiLink Q1813186.
- Q6058630 wikiPageWikiLink Q194356.
- Q6058630 wikiPageWikiLink Q25236.
- Q6058630 wikiPageWikiLink Q2537743.
- Q6058630 wikiPageWikiLink Q2639469.
- Q6058630 wikiPageWikiLink Q30.
- Q6058630 wikiPageWikiLink Q3962376.
- Q6058630 wikiPageWikiLink Q43302.
- Q6058630 wikiPageWikiLink Q49833.
- Q6058630 wikiPageWikiLink Q674113.
- Q6058630 wikiPageWikiLink Q6840876.
- Q6058630 wikiPageWikiLink Q8319743.
- Q6058630 wikiPageWikiLink Q8324264.
- Q6058630 wikiPageWikiLink Q8414148.
- Q6058630 country Q30.
- Q6058630 location "Sac and Buena Vista countries in Iowa".
- Q6058630 name "Intrepid Wind Farm".
- Q6058630 operator Q6840876.
- Q6058630 owner Q6840876.
- Q6058630 psElectricalCapacity "160.5".
- Q6058630 status "Operational".
- Q6058630 point "42.553333333333335 -95.32111111111111".
- Q6058630 type Place.
- Q6058630 type ArchitecturalStructure.
- Q6058630 type Infrastructure.
- Q6058630 type Location.
- Q6058630 type Place.
- Q6058630 type PowerStation.
- Q6058630 type Thing.
- Q6058630 type SpatialThing.
- Q6058630 type Q159719.
- Q6058630 comment "The Intrepid Wind Farm consists of 107 wind turbines, located in Sac and Buena Vista counties in north-west Iowa, has a generating capacity of 160.5 megawatts of electricity.".
- Q6058630 label "Intrepid Wind Farm".
- Q6058630 lat "42.553333333333335".
- Q6058630 long "-95.32111111111111".
- Q6058630 name "Intrepid Wind Farm".