Matches in DBpedia 2016-04 for { <http://wikidata.dbpedia.org/resource/Q5180992> ?p ?o }
Showing triples 1 to 46 of
46
with 100 triples per page.
- Q5180992 subject Q16791525.
- Q5180992 subject Q8360199.
- Q5180992 subject Q8360869.
- Q5180992 subject Q8529370.
- Q5180992 abstract "The Craig Goch Dam, often called the Top dam, is a masonry dam in the Elan Valley of Wales and creates the upper-most of the Elan Valley Reservoirs. Construction on the dam began in 1897, and it was completed in 1904. The primary purpose of the dam and the other reservoirs is to supply Birmingham with water. In 1997, a 480 kW hydroelectric generator began operation at the dam.".
- Q5180992 buildingStartDate "1897".
- Q5180992 buildingStartYear "1897".
- Q5180992 height "36.576".
- Q5180992 length "118.872".
- Q5180992 openingYear "1904".
- Q5180992 thumbnail Craig_Goch_dam_-_geograph.org.uk_-_480379.jpg?width=300.
- Q5180992 volume "61175.36".
- Q5180992 wikiPageWikiLink Q1324865.
- Q5180992 wikiPageWikiLink Q16791525.
- Q5180992 wikiPageWikiLink Q217817.
- Q5180992 wikiPageWikiLink Q2256.
- Q5180992 wikiPageWikiLink Q25.
- Q5180992 wikiPageWikiLink Q25236.
- Q5180992 wikiPageWikiLink Q5353391.
- Q5180992 wikiPageWikiLink Q6783805.
- Q5180992 wikiPageWikiLink Q80638.
- Q5180992 wikiPageWikiLink Q8360199.
- Q5180992 wikiPageWikiLink Q8360869.
- Q5180992 wikiPageWikiLink Q8529370.
- Q5180992 constructionBegan "1897".
- Q5180992 name "Craig Goch Dam".
- Q5180992 opening "1904".
- Q5180992 plantCapacity "480.0".
- Q5180992 plantCommission "1997".
- Q5180992 plantTurbines "1".
- Q5180992 point "52.304722222222225 -3.6238888888888887".
- Q5180992 type Place.
- Q5180992 type ArchitecturalStructure.
- Q5180992 type Dam.
- Q5180992 type Infrastructure.
- Q5180992 type Location.
- Q5180992 type Place.
- Q5180992 type Thing.
- Q5180992 type SpatialThing.
- Q5180992 type Q12323.
- Q5180992 comment "The Craig Goch Dam, often called the Top dam, is a masonry dam in the Elan Valley of Wales and creates the upper-most of the Elan Valley Reservoirs. Construction on the dam began in 1897, and it was completed in 1904. The primary purpose of the dam and the other reservoirs is to supply Birmingham with water. In 1997, a 480 kW hydroelectric generator began operation at the dam.".
- Q5180992 label "Craig Goch Dam".
- Q5180992 lat "52.304722222222225".
- Q5180992 long "-3.6238888888888887".
- Q5180992 depiction Craig_Goch_dam_-_geograph.org.uk_-_480379.jpg.
- Q5180992 name "Craig Goch Dam".