Matches in DBpedia 2016-04 for { <http://wikidata.dbpedia.org/resource/Q5066697> ?p ?o }
Showing triples 1 to 74 of
74
with 100 triples per page.
- Q5066697 subject Q8295298.
- Q5066697 subject Q8626856.
- Q5066697 abstract "The Changping Line of the Beijing Subway (Chinese: 北京地铁昌平线; pinyin: běijīng dìtiě chāngpíng xiàn) is a mostly elevated rapid transit line in northern Beijing. The line started construction in 2009. In September 2010, Construction was completed, and was followed by three-month test run. The line opened on December 30, 2010 and currently runs north from the Xi'erqi station on Line 13 to Nanshao. It is 21.24 km in length with 7 stations, only Nanshao is underground. During rush hours, the section between Life Science Park and Xi'erqi Stations is most congested section in the Beijing subway network, operating at 132% capacity.After a second phase of construction, the Changping Line will be extended further north to the Thirteen Tombs Scenic Area, and will connect central Changping District with Beijing subway network.".
- Q5066697 isPartOf Q235319.
- Q5066697 lineLength "31900.0".
- Q5066697 numberOfStations "12".
- Q5066697 openingDate "2010-12-30".
- Q5066697 openingDate "2015-12-26".
- Q5066697 openingYear "2010".
- Q5066697 openingYear "2015".
- Q5066697 passengersPerDay "157100".
- Q5066697 passengersPerDay "201000".
- Q5066697 routeEnd Q21245985.
- Q5066697 routeStart Q4674479.
- Q5066697 speedLimit "100.0".
- Q5066697 status "Operational".
- Q5066697 thumbnail 北京地铁沙河站.JPG?width=300.
- Q5066697 type Q5503.
- Q5066697 wikiPageExternalLink g2008111722533.jpg.
- Q5066697 wikiPageWikiLink Q21017081.
- Q5066697 wikiPageWikiLink Q21245977.
- Q5066697 wikiPageWikiLink Q21245978.
- Q5066697 wikiPageWikiLink Q21245984.
- Q5066697 wikiPageWikiLink Q21245985.
- Q5066697 wikiPageWikiLink Q235319.
- Q5066697 wikiPageWikiLink Q393454.
- Q5066697 wikiPageWikiLink Q393485.
- Q5066697 wikiPageWikiLink Q4074911.
- Q5066697 wikiPageWikiLink Q41135.
- Q5066697 wikiPageWikiLink Q4390966.
- Q5066697 wikiPageWikiLink Q4392198.
- Q5066697 wikiPageWikiLink Q4392266.
- Q5066697 wikiPageWikiLink Q4674479.
- Q5066697 wikiPageWikiLink Q4881191.
- Q5066697 wikiPageWikiLink Q5503.
- Q5066697 wikiPageWikiLink Q5936696.
- Q5066697 wikiPageWikiLink Q5937736.
- Q5066697 wikiPageWikiLink Q5938143.
- Q5066697 wikiPageWikiLink Q5976575.
- Q5066697 wikiPageWikiLink Q6119466.
- Q5066697 wikiPageWikiLink Q680973.
- Q5066697 wikiPageWikiLink Q8201.
- Q5066697 wikiPageWikiLink Q8295298.
- Q5066697 wikiPageWikiLink Q845512.
- Q5066697 wikiPageWikiLink Q847744.
- Q5066697 wikiPageWikiLink Q847771.
- Q5066697 wikiPageWikiLink Q847791.
- Q5066697 wikiPageWikiLink Q8626856.
- Q5066697 wikiPageWikiLink Q956.
- Q5066697 end Q21245985.
- Q5066697 linelength "31.9".
- Q5066697 open "2010-12-30".
- Q5066697 open "2015-12-26".
- Q5066697 ridership "157100".
- Q5066697 ridership "201000".
- Q5066697 speed "100.0".
- Q5066697 start Q4674479.
- Q5066697 stations "12".
- Q5066697 status "Operational".
- Q5066697 system Q235319.
- Q5066697 type Q5503.
- Q5066697 type Place.
- Q5066697 type ArchitecturalStructure.
- Q5066697 type Infrastructure.
- Q5066697 type Location.
- Q5066697 type Place.
- Q5066697 type RailwayLine.
- Q5066697 type RouteOfTransportation.
- Q5066697 type Thing.
- Q5066697 type Q728937.
- Q5066697 comment "The Changping Line of the Beijing Subway (Chinese: 北京地铁昌平线; pinyin: běijīng dìtiě chāngpíng xiàn) is a mostly elevated rapid transit line in northern Beijing. The line started construction in 2009. In September 2010, Construction was completed, and was followed by three-month test run. The line opened on December 30, 2010 and currently runs north from the Xi'erqi station on Line 13 to Nanshao. It is 21.24 km in length with 7 stations, only Nanshao is underground.".
- Q5066697 label "Changping Line, Beijing Subway".
- Q5066697 differentFrom Q4390966.
- Q5066697 depiction 北京地铁沙河站.JPG.