Matches in DBpedia 2016-04 for { <http://wikidata.dbpedia.org/resource/Q5044153> ?p ?o }
Showing triples 1 to 55 of
55
with 100 triples per page.
- Q5044153 subject Q8323867.
- Q5044153 subject Q8947128.
- Q5044153 abstract "Carno is a wind farm of 68 turbines which started operation in October 1996. It covers an area of over 600 hectares on Trannon Moor, a plateau to the west of the village of Carno in Powys, Mid Wales, 400 metres (1,300 ft) above sea level.Carno currently has the largest production capacity in Wales.Originally consisting of 56 wind turbines each of 600 kilowatts (kW) maximum output, the combined maximum power of 33.6 megawatts (MW) made Carno the largest Wind Farm in Europe at the time of its construction. The total project cost was approximately £26 million.Information:Number of turbines: 56 (extended to 68 with Carno 2 in 2008)Turbine manufacturer: Bonus Energy A/S, DenmarkTurbine rating: 600 kW.Combined maximum power: 33.6MWTower height to hub: 31.5 metres (103 ft)Blade number and diameter: 3 blades, each 44 metres (144 ft) longAnnual production: 90 million unitsWildlife information: 37 species of birds. 512 species of insects & spiders, including one Red Data Book entry, the nationally scarce Trechus rivularis ground beetle.Archaeological features: Bronze Age cairns, standing stones and a possible Roman road crossing from east to west.Public footpaths cross the site and are waymarked on Ordnance Survey maps.In 2008, an extension designated "Carno 2" was completed, bringing the total number of turbines to 68, comprising 12 new Siemens 1.3MW wind turbines with a hub height of 49 metres (161 ft), blade length of 30 metres (98 ft) and rotor diameter of 62 metres (203 ft) giving a tip height of 80 metres (260 ft).".
- Q5044153 country Q145.
- Q5044153 country Q25.
- Q5044153 installedCapacity "4.92E7".
- Q5044153 location Q156150.
- Q5044153 location Q3402958.
- Q5044153 openingYear "1996".
- Q5044153 openingYear "2009".
- Q5044153 owner Q829558.
- Q5044153 status "Operational".
- Q5044153 thumbnail Carno_Wind_Farm_(by_Oliver-Dixon,_903927_3dd163da).jpg?width=300.
- Q5044153 wikiPageExternalLink project.tmpl?command=search&db=grew.db&eqSKUdatarq=16&dir=grew.
- Q5044153 wikiPageExternalLink www.npower.com.
- Q5044153 wikiPageWikiLink Q11761.
- Q5044153 wikiPageWikiLink Q145.
- Q5044153 wikiPageWikiLink Q156150.
- Q5044153 wikiPageWikiLink Q194356.
- Q5044153 wikiPageWikiLink Q25.
- Q5044153 wikiPageWikiLink Q3094811.
- Q5044153 wikiPageWikiLink Q3306854.
- Q5044153 wikiPageWikiLink Q3402958.
- Q5044153 wikiPageWikiLink Q49833.
- Q5044153 wikiPageWikiLink Q7321974.
- Q5044153 wikiPageWikiLink Q81230.
- Q5044153 wikiPageWikiLink Q820588.
- Q5044153 wikiPageWikiLink Q829558.
- Q5044153 wikiPageWikiLink Q8323867.
- Q5044153 wikiPageWikiLink Q8947128.
- Q5044153 commissioned "March 2009".
- Q5044153 commissioned "October 1996".
- Q5044153 country Q145.
- Q5044153 country Q25.
- Q5044153 location "near Carno, Powys".
- Q5044153 name "Carno Wind Farm".
- Q5044153 owner Q829558.
- Q5044153 psElectricalCapacity "49.2".
- Q5044153 status "Operational".
- Q5044153 point "52.55027777777778 -3.600277777777778".
- Q5044153 type Place.
- Q5044153 type ArchitecturalStructure.
- Q5044153 type Infrastructure.
- Q5044153 type Location.
- Q5044153 type Place.
- Q5044153 type PowerStation.
- Q5044153 type Thing.
- Q5044153 type SpatialThing.
- Q5044153 type Q159719.
- Q5044153 comment "Carno is a wind farm of 68 turbines which started operation in October 1996.".
- Q5044153 label "Carno wind farm".
- Q5044153 lat "52.55027777777778".
- Q5044153 long "-3.600277777777778".
- Q5044153 depiction Carno_Wind_Farm_(by_Oliver-Dixon,_903927_3dd163da).jpg.
- Q5044153 name "Carno Wind Farm".