- Q4878734 abstract "The Walter C. Beckjord Generating Station was a formerly 1.433-GW dual-fuel power generating facility located in New Richmond, Ohio, 22 miles east of Cincinnati, Ohio. Of the two Beckjord power plants, one was coal-fired (Units 1–6) and the other was oil-fired (Units GT1–GT4). It was originally built by Cinergy (originally Cincinnati Gas and Electric Company), which was bought by Duke Energy in 2006. All generation at the site was ceased as of the end of 2014.In 2015, Duke Energy installed a battery-based energy storage system at the site for the purpose of regulating frequency in the electric grid.".
- Q4878734 thumbnail BeckjordPowerStation.JPG?width=300.
- Q4878734 wikiPageExternalLink capacity.html.
- Q4878734 wikiPageWikiLink Q1133499.
- Q4878734 wikiPageWikiLink Q1264404.
- Q4878734 wikiPageWikiLink Q1361387.
- Q4878734 wikiPageWikiLink Q2341134.
- Q4878734 wikiPageWikiLink Q25236.
- Q4878734 wikiPageWikiLink Q43196.
- Q4878734 wikiPageWikiLink Q5120885.
- Q4878734 wikiPageWikiLink Q8320191.
- Q4878734 wikiPageWikiLink Q8384929.
- Q4878734 wikiPageWikiLink Q8391707.
- Q4878734 wikiPageWikiLink Q8414049.
- Q4878734 wikiPageWikiLink Q8414051.
- Q4878734 wikiPageWikiLink Q8414053.
- Q4878734 wikiPageWikiLink Q8414062.
- Q4878734 wikiPageWikiLink Q8414072.
- Q4878734 wikiPageWikiLink Q8414085.
- Q4878734 wikiPageWikiLink Q8414092.
- Q4878734 point "38.99208333333333 -84.29722222222222".
- Q4878734 type SpatialThing.
- Q4878734 comment "The Walter C. Beckjord Generating Station was a formerly 1.433-GW dual-fuel power generating facility located in New Richmond, Ohio, 22 miles east of Cincinnati, Ohio. Of the two Beckjord power plants, one was coal-fired (Units 1–6) and the other was oil-fired (Units GT1–GT4). It was originally built by Cinergy (originally Cincinnati Gas and Electric Company), which was bought by Duke Energy in 2006.".
- Q4878734 label "Beckjord Power Station".
- Q4878734 lat "38.99208333333333".
- Q4878734 long "-84.29722222222222".
- Q4878734 depiction BeckjordPowerStation.JPG.