- Q455472 abstract "Gwynt y Môr (English: Sea Wind) is a 576-megawatt (MW) offshore wind farm located off the coast of North Wales and is the second largest operating offshore windfarm in the world. The farm has 160 wind turbines of 150 metres (490 ft) tip height above mean sea level.Planning consent for the project was granted on 3 December 2008. The project has a value of 2 billion Euros, of which 1.2 billion Euros were spent on turbines and electrical connections. Construction began in 2012, power production started in September 2013, construction phase ended in November 2014, and final commissioning occurred in June 2015. As of 2015 it is the second largest offshore wind farm in the world.".
- Q455472 buildingStartDate "January 2012".
- Q455472 buildingStartYear "2012".
- Q455472 installedCapacity "5.76E8".
- Q455472 location Q145.
- Q455472 location Q1892770.
- Q455472 openingDate "2015-06-18".
- Q455472 openingYear "2015".
- Q455472 owner Q7864874.
- Q455472 owner Q81230.
- Q455472 owner Q829558.
- Q455472 owner Q882871.
- Q455472 status "On-line".
- Q455472 wikiPageExternalLink gwynt-y-mr-home.
- Q455472 wikiPageWikiLink Q1357601.
- Q455472 wikiPageWikiLink Q138133.
- Q455472 wikiPageWikiLink Q145.
- Q455472 wikiPageWikiLink Q1813210.
- Q455472 wikiPageWikiLink Q1860.
- Q455472 wikiPageWikiLink Q1892770.
- Q455472 wikiPageWikiLink Q1997.
- Q455472 wikiPageWikiLink Q2469078.
- Q455472 wikiPageWikiLink Q25236.
- Q455472 wikiPageWikiLink Q3306854.
- Q455472 wikiPageWikiLink Q4856825.
- Q455472 wikiPageWikiLink Q504027.
- Q455472 wikiPageWikiLink Q548248.
- Q455472 wikiPageWikiLink Q6631609.
- Q455472 wikiPageWikiLink Q7864874.
- Q455472 wikiPageWikiLink Q81230.
- Q455472 wikiPageWikiLink Q820588.
- Q455472 wikiPageWikiLink Q829558.
- Q455472 wikiPageWikiLink Q833910.
- Q455472 wikiPageWikiLink Q833917.
- Q455472 wikiPageWikiLink Q8617493.
- Q455472 wikiPageWikiLink Q8683163.
- Q455472 wikiPageWikiLink Q8692673.
- Q455472 wikiPageWikiLink Q882871.
- Q455472 wikiPageWikiLink Q8947128.
- Q455472 commissioned "2015-06-18".
- Q455472 constructionBegan "January 2012".
- Q455472 location "off the coast of North Wales, UK".
- Q455472 name "Gwynt y Môr Offshore Wind Farm".
- Q455472 owner "RWE Npower".
- Q455472 owner "Siemens".
- Q455472 owner "Stadtwerke München".
- Q455472 owner "UK Green Investment Bank".
- Q455472 psElectricalCapacity "576.0".
- Q455472 status "On-line".
- Q455472 point "53.45 -3.5833333333333335".
- Q455472 type Place.
- Q455472 type ArchitecturalStructure.
- Q455472 type Infrastructure.
- Q455472 type Location.
- Q455472 type Place.
- Q455472 type PowerStation.
- Q455472 type Thing.
- Q455472 type SpatialThing.
- Q455472 type Q159719.
- Q455472 comment "Gwynt y Môr (English: Sea Wind) is a 576-megawatt (MW) offshore wind farm located off the coast of North Wales and is the second largest operating offshore windfarm in the world. The farm has 160 wind turbines of 150 metres (490 ft) tip height above mean sea level.Planning consent for the project was granted on 3 December 2008. The project has a value of 2 billion Euros, of which 1.2 billion Euros were spent on turbines and electrical connections.".
- Q455472 label "Gwynt y Môr".
- Q455472 lat "53.45".
- Q455472 long "-3.5833333333333335".
- Q455472 name "Gwynt y Môr Offshore Wind Farm".