Matches in DBpedia 2016-04 for { <http://wikidata.dbpedia.org/resource/Q21044364> ?p ?o }
Showing triples 1 to 59 of
59
with 100 triples per page.
- Q21044364 subject Q16785707.
- Q21044364 subject Q8759801.
- Q21044364 subject Q8798277.
- Q21044364 abstract "The Copiapó Solar Project is a 260 megawatt (MW) net solar thermal power project to be located near Copiapó, about 65 kilometers east of the coastal town of Caldera. The project is being developed by SolarReserve., and is scheduled to reach commercial operation in 2019.The Copiapó project will comprise two 120 megawatt (MW, 130 MW gross) solar thermal towers with up to 14 hours thermal storage, combined with 150 MW of PV. The hybrid project will deliver over 1,700 gigawatt hours (GW·h) annually, as non-intermittent baseload power, 24 hours a day. The project uses heliostat mirrors that collect and focus the sun's thermal energy to heat molten salt flowing through a solar power tower. The molten salt circulates from the tower to a storage tank, where it is then used to produce steam and generate electricity. Excess thermal energy is stored in the molten salt and can be used to generate power for up to fourteen hours, including during the evening hours and when direct sunlight is not available. The project's solar tower component technology is based on the SolarReserve Crescent Dunes Solar Energy Project in the US.The project is expected to cost $2 billion,The Copiapó Solar project was submitted to a full environmental assessment under the Chilean system of Environmental Impact Assessment (SEIA) administered by the Department of Environmental Assessment (SEA), and received an Environmental Qualification Resolution (RCA), as it is called the Chilean environmental permit, on August 19, 2015.The hybrid concept combines two or more energy conversion mechanisms, that integrated, overcome limitations inherent in either. The purpose is to provide a high level of energy security and reliability through the integrated mix of complementary generation methods. Specifically, photovoltaics, to date, has a lower cost if one ignores the dispatchability question, that instead is solved by the solar thermal component.".
- Q21044364 country Q298.
- Q21044364 installedCapacity "2.6E8".
- Q21044364 location Q2120.
- Q21044364 location Q3868.
- Q21044364 openingYear "2019".
- Q21044364 status "P".
- Q21044364 wikiPageExternalLink www.municipalidadcopiapo.cl.
- Q21044364 wikiPageExternalLink www.sea.gob.cl.
- Q21044364 wikiPageExternalLink www.solarreserve.com.
- Q21044364 wikiPageWikiLink Q1063748.
- Q21044364 wikiPageWikiLink Q1347279.
- Q21044364 wikiPageWikiLink Q13847726.
- Q21044364 wikiPageWikiLink Q16000332.
- Q21044364 wikiPageWikiLink Q16785707.
- Q21044364 wikiPageWikiLink Q182098.
- Q21044364 wikiPageWikiLink Q192127.
- Q21044364 wikiPageWikiLink Q1931010.
- Q21044364 wikiPageWikiLink Q2120.
- Q21044364 wikiPageWikiLink Q25236.
- Q21044364 wikiPageWikiLink Q285927.
- Q21044364 wikiPageWikiLink Q298.
- Q21044364 wikiPageWikiLink Q303288.
- Q21044364 wikiPageWikiLink Q3708.
- Q21044364 wikiPageWikiLink Q3868.
- Q21044364 wikiPageWikiLink Q47141.
- Q21044364 wikiPageWikiLink Q5184359.
- Q21044364 wikiPageWikiLink Q5282546.
- Q21044364 wikiPageWikiLink Q5762182.
- Q21044364 wikiPageWikiLink Q7555833.
- Q21044364 wikiPageWikiLink Q8759801.
- Q21044364 wikiPageWikiLink Q8798277.
- Q21044364 commissioned "2019".
- Q21044364 country Q298.
- Q21044364 location Q2120.
- Q21044364 location Q3868.
- Q21044364 name "Copiapó Solar Project".
- Q21044364 psElectricalCapacity "260.0".
- Q21044364 status "P".
- Q21044364 website www.solarreserve.com.
- Q21044364 point "-27.35 -70.31666666666666".
- Q21044364 type Place.
- Q21044364 type ArchitecturalStructure.
- Q21044364 type Infrastructure.
- Q21044364 type Location.
- Q21044364 type Place.
- Q21044364 type PowerStation.
- Q21044364 type Thing.
- Q21044364 type SpatialThing.
- Q21044364 type Q159719.
- Q21044364 comment "The Copiapó Solar Project is a 260 megawatt (MW) net solar thermal power project to be located near Copiapó, about 65 kilometers east of the coastal town of Caldera. The project is being developed by SolarReserve., and is scheduled to reach commercial operation in 2019.The Copiapó project will comprise two 120 megawatt (MW, 130 MW gross) solar thermal towers with up to 14 hours thermal storage, combined with 150 MW of PV.".
- Q21044364 label "Copiapó Solar Project".
- Q21044364 lat "-27.35".
- Q21044364 long "-70.31666666666666".
- Q21044364 homepage www.solarreserve.com.
- Q21044364 name "Copiapó Solar Project".