Matches in DBpedia 2016-04 for { <http://wikidata.dbpedia.org/resource/Q17400525> ?p ?o }
Showing triples 1 to 59 of
59
with 100 triples per page.
- Q17400525 subject Q18067956.
- Q17400525 subject Q6616525.
- Q17400525 subject Q8193106.
- Q17400525 subject Q8360349.
- Q17400525 subject Q8396607.
- Q17400525 subject Q8408779.
- Q17400525 subject Q8414155.
- Q17400525 abstract "The Tai'an Pumped Storage Power Station is a 1,000 MW pumped-storage hydroelectric power station located in the city of Tai'an in Shandong Province, China. Construction on the project began in February 2000 and the upper reservoir began to fill in May 2005. The four generators were commissioned between December 2005 and August 2007. The power station operates by shifting water between an upper and lower reservoir to generate electricity. The lower reservoir, Dahe Reservoir, was originally built in 1960 but repaired extensively for the project. The Tai'an Upper Reservoir is located in a valley above the east side of the lower reservoir. During periods of low energy demand, such as at night, water is pumped from Tai'an Lower Reservoir up to the upper reservoir. When energy demand is high, the water is released back down to the lower reservoir but the pump turbines that pumped the water up now reverse mode and serve as generators to produce electricity. The process is repeated as necessary and the plant serves as a peaking power plant. It is operated by State Grid Xinyuan Co.The lower reservoir is created by a 22 m (72 ft) tall and 773 m (2,536 ft) long earth-fill dam on the Pan Wen River. It can withhold up to 22,347,000 m3 (18,117 acre·ft) of water. The upper reservoir is created by a 99.8 m (327 ft) tall and 413.8 m (1,358 ft) long concrete-face rock-fill dam. It can withhold up to 10,430,900 m3 (8,456.5 acre·ft) of water, of which 8,900,000 m3 (7,200 acre·ft) can be used for power production. Water from the upper reservoir is sent to the 1,000 MW underground power station down near the lower reservoir through two 569.15–577.10 m (1,867.3–1,893.4 ft) long headrace/penstock pipes. The drop in elevation between the upper and lower reservoir affords a hydraulic head (water drop) of 248 m (814 ft).".
- Q17400525 averageAnnualGeneration "4.68E15".
- Q17400525 buildingStartDate "February 2000".
- Q17400525 buildingStartYear "2000".
- Q17400525 installedCapacity "1.0E9".
- Q17400525 location Q217681.
- Q17400525 location Q43407.
- Q17400525 openingYear "2005".
- Q17400525 status "O".
- Q17400525 wikiPageWikiLink Q12323.
- Q17400525 wikiPageWikiLink Q1244922.
- Q17400525 wikiPageWikiLink Q1260995.
- Q17400525 wikiPageWikiLink Q1664208.
- Q17400525 wikiPageWikiLink Q18067956.
- Q17400525 wikiPageWikiLink Q1864231.
- Q17400525 wikiPageWikiLink Q18979989.
- Q17400525 wikiPageWikiLink Q217681.
- Q17400525 wikiPageWikiLink Q217817.
- Q17400525 wikiPageWikiLink Q25236.
- Q17400525 wikiPageWikiLink Q339353.
- Q17400525 wikiPageWikiLink Q369743.
- Q17400525 wikiPageWikiLink Q43407.
- Q17400525 wikiPageWikiLink Q6616525.
- Q17400525 wikiPageWikiLink Q80638.
- Q17400525 wikiPageWikiLink Q8193106.
- Q17400525 wikiPageWikiLink Q8360349.
- Q17400525 wikiPageWikiLink Q8396607.
- Q17400525 wikiPageWikiLink Q8408779.
- Q17400525 wikiPageWikiLink Q8414155.
- Q17400525 commissioned "2005".
- Q17400525 constructionBegan "February 2000".
- Q17400525 location Q217681.
- Q17400525 location Q43407.
- Q17400525 name "Tai'an Pumped Storage Power Station".
- Q17400525 psAnnualGeneration "1.3E9".
- Q17400525 psElectricalCapacity "1000.0".
- Q17400525 status "O".
- Q17400525 point "36.225427777777774 117.04318888888889".
- Q17400525 type Place.
- Q17400525 type ArchitecturalStructure.
- Q17400525 type Infrastructure.
- Q17400525 type Location.
- Q17400525 type Place.
- Q17400525 type PowerStation.
- Q17400525 type Thing.
- Q17400525 type SpatialThing.
- Q17400525 type Q159719.
- Q17400525 comment "The Tai'an Pumped Storage Power Station is a 1,000 MW pumped-storage hydroelectric power station located in the city of Tai'an in Shandong Province, China. Construction on the project began in February 2000 and the upper reservoir began to fill in May 2005. The four generators were commissioned between December 2005 and August 2007. The power station operates by shifting water between an upper and lower reservoir to generate electricity.".
- Q17400525 label "Tai'an Pumped Storage Power Station".
- Q17400525 lat "36.225427777777774".
- Q17400525 long "117.04318888888889".
- Q17400525 name "Tai'an Pumped Storage Power Station".