- Q14680574 abstract "The Mesquite Solar project is a photovoltaic power plant being built in Arlington, Maricopa County, Arizona, owned by Sempra Generation. Phase 1 has a nameplate capacity of 150 megawatts (MW). The project has a planned capacity of up to 700 MW when completed, making it the world's largest PV power station.Mesquite Solar 1 uses 800,000 solar panels from Suntech Power. The EPC contractor is Zachry Holdings. Construction began in 2011 and was completed in 2013.Mesquite 1 is projected to generate more than 350 gigawatt-hours of electricity annually (an average of about 40 MW), and will offset roughly 200,000 tons of carbon emissions each year.Phase 1 cost about $600 million. Sempra Generation has signed a 20-year Power Purchase Agreement (PPA) with Pacific Gas and Electric Company (PG&E) for the 150 MW from Mesquite 1.In late December, 2011, 42 MW was completed and connected to the grid. Sempra Energy completed the 150 MW phase of the Project in January 2013.".
- Q14680574 country Q30.
- Q14680574 location Q4792251.
- Q14680574 status "Operational".
- Q14680574 wikiPageWikiLink Q1003207.
- Q14680574 wikiPageWikiLink Q1133499.
- Q14680574 wikiPageWikiLink Q1188943.
- Q14680574 wikiPageWikiLink Q1815011.
- Q14680574 wikiPageWikiLink Q182098.
- Q14680574 wikiPageWikiLink Q200974.
- Q14680574 wikiPageWikiLink Q25236.
- Q14680574 wikiPageWikiLink Q30.
- Q14680574 wikiPageWikiLink Q4120404.
- Q14680574 wikiPageWikiLink Q4170531.
- Q14680574 wikiPageWikiLink Q4792251.
- Q14680574 wikiPageWikiLink Q58691.
- Q14680574 wikiPageWikiLink Q7449804.
- Q14680574 wikiPageWikiLink Q7556738.
- Q14680574 wikiPageWikiLink Q816.
- Q14680574 wikiPageWikiLink Q8322560.
- Q14680574 wikiPageWikiLink Q8759700.
- Q14680574 wikiPageWikiLink Q9082585.
- Q14680574 country Q30.
- Q14680574 location Q4792251.
- Q14680574 name "Mesquite Solar project".
- Q14680574 status "Operational".
- Q14680574 point "33.333333333333336 -112.91666666666667".
- Q14680574 type Place.
- Q14680574 type ArchitecturalStructure.
- Q14680574 type Infrastructure.
- Q14680574 type Location.
- Q14680574 type Place.
- Q14680574 type PowerStation.
- Q14680574 type Thing.
- Q14680574 type SpatialThing.
- Q14680574 type Q159719.
- Q14680574 comment "The Mesquite Solar project is a photovoltaic power plant being built in Arlington, Maricopa County, Arizona, owned by Sempra Generation. Phase 1 has a nameplate capacity of 150 megawatts (MW). The project has a planned capacity of up to 700 MW when completed, making it the world's largest PV power station.Mesquite Solar 1 uses 800,000 solar panels from Suntech Power. The EPC contractor is Zachry Holdings.".
- Q14680574 label "Mesquite Solar project".
- Q14680574 lat "33.333333333333336".
- Q14680574 long "-112.91666666666667".
- Q14680574 name "Mesquite Solar project".