Matches in DBpedia 2016-04 for { <http://wikidata.dbpedia.org/resource/Q13426065> ?p ?o }
Showing triples 1 to 38 of
38
with 100 triples per page.
- Q13426065 subject Q8798259.
- Q13426065 subject Q8883697.
- Q13426065 abstract "The Pitești-Craiova Motorway (Romanian: Autostrada Pitești–Craiova) is a planned motorway in the south-western part of Romania labelled as A12. It will connect the cities of Pitești, Slatina and Craiova. It is planned to be 121 km long, with an estimated total cost of 1.66 billion euro, and reportedly shall be completed until 2016.Its construction was tendered as a concession contract in March 2013, that shall be awarded until December 2013. It shall also be decided whether it will be built as a motorway or an expressway.".
- Q13426065 length "121000.0".
- Q13426065 routeEnd Q168057.
- Q13426065 routeStart Q187938.
- Q13426065 thumbnail Romania_Motorway_A12.svg?width=300.
- Q13426065 wikiPageExternalLink viewer.html?webmap=29012e0cfe324327a3708c645eb41591&extent=23.7338,44.2882,25.0796,44.843.
- Q13426065 wikiPageExternalLink proiect.php?id=64.
- Q13426065 wikiPageWikiLink Q10858152.
- Q13426065 wikiPageWikiLink Q1291190.
- Q13426065 wikiPageWikiLink Q15401612.
- Q13426065 wikiPageWikiLink Q168057.
- Q13426065 wikiPageWikiLink Q187938.
- Q13426065 wikiPageWikiLink Q207074.
- Q13426065 wikiPageWikiLink Q218.
- Q13426065 wikiPageWikiLink Q327209.
- Q13426065 wikiPageWikiLink Q429181.
- Q13426065 wikiPageWikiLink Q46622.
- Q13426065 wikiPageWikiLink Q8798259.
- Q13426065 wikiPageWikiLink Q8883697.
- Q13426065 lengthKm "121".
- Q13426065 name "Pitești–Craiova Motorway".
- Q13426065 terminusA "Pitești".
- Q13426065 terminusB "Craiova".
- Q13426065 type Place.
- Q13426065 type ArchitecturalStructure.
- Q13426065 type Infrastructure.
- Q13426065 type Location.
- Q13426065 type Place.
- Q13426065 type Road.
- Q13426065 type RouteOfTransportation.
- Q13426065 type Thing.
- Q13426065 type Q34442.
- Q13426065 comment "The Pitești-Craiova Motorway (Romanian: Autostrada Pitești–Craiova) is a planned motorway in the south-western part of Romania labelled as A12. It will connect the cities of Pitești, Slatina and Craiova. It is planned to be 121 km long, with an estimated total cost of 1.66 billion euro, and reportedly shall be completed until 2016.Its construction was tendered as a concession contract in March 2013, that shall be awarded until December 2013.".
- Q13426065 label "Pitești–Craiova Motorway".
- Q13426065 depiction Romania_Motorway_A12.svg.
- Q13426065 name "Pitești–Craiova Motorway".