- Recovery_point_objective abstract "A recovery point objective, or “RPO”, is defined by business continuity planning. It is the maximum targeted period in which data might be lost from an IT service due to a major incident.The RPO gives systems designers a limit to work to. For instance, if the RPO is set to four hours, then in practice, off-site mirrored backups must be continuously maintained – a daily off-site backup on tape will not suffice. Care must be taken to avoid two common mistakes around the use and definition of RPO. Firstly, business continuity staff use business impact analysis to determine RPO for each service – RPO is not determined by the existent backup regime. Secondly, when any level of preparation of off-site data is required, rather than at the time the backups are offsited, the period during which data is lost very often starts near the time of the beginning of the work to prepare backups which are eventually offsited.".
- Recovery_point_objective wikiPageID "7887852".
- Recovery_point_objective wikiPageLength "9079".
- Recovery_point_objective wikiPageOutDegree "5".
- Recovery_point_objective wikiPageRevisionID "699324379".
- Recovery_point_objective wikiPageWikiLink Business_continuity_planning.
- Recovery_point_objective wikiPageWikiLink Category:Business_continuity_and_disaster_recovery.
- Recovery_point_objective wikiPageWikiLink Data.
- Recovery_point_objective wikiPageWikiLink Recovery_time_objective.
- Recovery_point_objective wikiPageWikiLinkText "Recovery point objective".
- Recovery_point_objective wikiPageWikiLinkText "recovery point objective".
- Recovery_point_objective wikiPageUsesTemplate Template:Refimprove.
- Recovery_point_objective subject Category:Business_continuity_and_disaster_recovery.
- Recovery_point_objective type Redirect.
- Recovery_point_objective comment "A recovery point objective, or “RPO”, is defined by business continuity planning. It is the maximum targeted period in which data might be lost from an IT service due to a major incident.The RPO gives systems designers a limit to work to. For instance, if the RPO is set to four hours, then in practice, off-site mirrored backups must be continuously maintained – a daily off-site backup on tape will not suffice.".
- Recovery_point_objective label "Recovery point objective".
- Recovery_point_objective sameAs Q927401.
- Recovery_point_objective sameAs Perte_de_données_maximale_admissible.
- Recovery_point_objective sameAs Recovery_Point_Objective.
- Recovery_point_objective sameAs m.026hq7r.
- Recovery_point_objective sameAs Q927401.
- Recovery_point_objective wasDerivedFrom Recovery_point_objective?oldid=699324379.
- Recovery_point_objective isPrimaryTopicOf Recovery_point_objective.