Matches in DBpedia 2016-04 for { <http://dbpedia.org/resource/Line_7,_Suzhou_Rail_Transit> ?p ?o }
Showing triples 1 to 53 of
53
with 100 triples per page.
- Line_7,_Suzhou_Rail_Transit abstract "Line 7 is a planned lateral line of Line 4 of Suzhou Rail Transit. Construction is expected to start in 2012; the line will be 11.1 kilometers long. It has Tian'edang Parking area (Chinese: 天鹅荡停车场) in the line. According to those plans the part of Line 4 between Shihulu and Wangshanlu stations will be operated as Line 7.".
- Line_7,_Suzhou_Rail_Transit isPartOf Suzhou_Rail_Transit.
- Line_7,_Suzhou_Rail_Transit lineLength "11100.0".
- Line_7,_Suzhou_Rail_Transit numberOfStations "7".
- Line_7,_Suzhou_Rail_Transit status "Under construction".
- Line_7,_Suzhou_Rail_Transit type Rapid_transit.
- Line_7,_Suzhou_Rail_Transit wikiPageID "36183343".
- Line_7,_Suzhou_Rail_Transit wikiPageLength "1754".
- Line_7,_Suzhou_Rail_Transit wikiPageOutDegree "7".
- Line_7,_Suzhou_Rail_Transit wikiPageRevisionID "665736010".
- Line_7,_Suzhou_Rail_Transit wikiPageWikiLink Branch_line.
- Line_7,_Suzhou_Rail_Transit wikiPageWikiLink Category:Suzhou_Rail_Transit.
- Line_7,_Suzhou_Rail_Transit wikiPageWikiLink Line_4,_Suzhou_Rail_Transit.
- Line_7,_Suzhou_Rail_Transit wikiPageWikiLink Rapid_transit.
- Line_7,_Suzhou_Rail_Transit wikiPageWikiLink Suzhou_Rail_Transit.
- Line_7,_Suzhou_Rail_Transit wikiPageWikiLink Tianedang_Parking_area.
- Line_7,_Suzhou_Rail_Transit wikiPageWikiLinkText "Line 7, Suzhou Rail Transit".
- Line_7,_Suzhou_Rail_Transit imageWidth "265".
- Line_7,_Suzhou_Rail_Transit linelength "11.1".
- Line_7,_Suzhou_Rail_Transit mapState "collapsed".
- Line_7,_Suzhou_Rail_Transit operator "Suzhou Rail Transit Co., Ltd".
- Line_7,_Suzhou_Rail_Transit owner "Suzhou Rail Transit Co., Ltd".
- Line_7,_Suzhou_Rail_Transit stations "7".
- Line_7,_Suzhou_Rail_Transit status "Under construction".
- Line_7,_Suzhou_Rail_Transit system Suzhou_Rail_Transit.
- Line_7,_Suzhou_Rail_Transit type Rapid_transit.
- Line_7,_Suzhou_Rail_Transit wikiPageUsesTemplate Template:Chinese_rapid_transit_header.
- Line_7,_Suzhou_Rail_Transit wikiPageUsesTemplate Template:Dated_info.
- Line_7,_Suzhou_Rail_Transit wikiPageUsesTemplate Template:Infobox_rail_line.
- Line_7,_Suzhou_Rail_Transit wikiPageUsesTemplate Template:RailGauge.
- Line_7,_Suzhou_Rail_Transit wikiPageUsesTemplate Template:Reflist.
- Line_7,_Suzhou_Rail_Transit wikiPageUsesTemplate Template:SZRT_color.
- Line_7,_Suzhou_Rail_Transit wikiPageUsesTemplate Template:Suzhou-stub.
- Line_7,_Suzhou_Rail_Transit wikiPageUsesTemplate Template:Zh.
- Line_7,_Suzhou_Rail_Transit subject Category:Suzhou_Rail_Transit.
- Line_7,_Suzhou_Rail_Transit hypernym Line.
- Line_7,_Suzhou_Rail_Transit type ArchitecturalStructure.
- Line_7,_Suzhou_Rail_Transit type Infrastructure.
- Line_7,_Suzhou_Rail_Transit type Place.
- Line_7,_Suzhou_Rail_Transit type RailwayLine.
- Line_7,_Suzhou_Rail_Transit type RouteOfTransportation.
- Line_7,_Suzhou_Rail_Transit type Location.
- Line_7,_Suzhou_Rail_Transit type Place.
- Line_7,_Suzhou_Rail_Transit type Thing.
- Line_7,_Suzhou_Rail_Transit type Q728937.
- Line_7,_Suzhou_Rail_Transit comment "Line 7 is a planned lateral line of Line 4 of Suzhou Rail Transit. Construction is expected to start in 2012; the line will be 11.1 kilometers long. It has Tian'edang Parking area (Chinese: 天鹅荡停车场) in the line. According to those plans the part of Line 4 between Shihulu and Wangshanlu stations will be operated as Line 7.".
- Line_7,_Suzhou_Rail_Transit label "Line 7, Suzhou Rail Transit".
- Line_7,_Suzhou_Rail_Transit sameAs Q6553157.
- Line_7,_Suzhou_Rail_Transit sameAs m.0k0vc7n.
- Line_7,_Suzhou_Rail_Transit sameAs Q6553157.
- Line_7,_Suzhou_Rail_Transit sameAs 苏州轨道交通8号线.
- Line_7,_Suzhou_Rail_Transit wasDerivedFrom Line_7,_Suzhou_Rail_Transit?oldid=665736010.
- Line_7,_Suzhou_Rail_Transit isPrimaryTopicOf Line_7,_Suzhou_Rail_Transit.