- Jindo–Jeju_HVDC_system abstract "The Jindo–Jeju HVDC system is a 105 km HVDC submarine cable connection in South Korea between the island of Jindo, close to the Korean Peninsula, and the more distant island of Jeju. The system has a capacity of 400 MW and transmission voltage of ±250 kV and was put into service in 2014. It is the second HVDC link to Jeju Island, after the Haenam–Cheju link completed in the late 1990s (the spelling of the island’s name was changed from Cheju to Jeju in 2000).The Jindo–Jeju HVDC system is owned and operated by Korea Electric Power Corporation (KEPCO). The cables were designed and built by LS Cable and System and the converter stations were designed and built by Alstom Grid.The scheme is bipolar but unlike the Haenam–Cheju connection, which used a relatively conventional arrangement with two high-voltage cables and a sea return, Jindo–Jeju HVDC system uses metallic return with a total of four cables: three high-voltage cables and one medium-voltage cable. The high-voltage cables use mass-impregnated paper as the insulation material while the medium-voltage cable uses Cross-linked polyethylene (XLPE) insulation.Two of the high-voltage cables are normally used as the respective high-voltage conductors for the two converter poles and the medium-voltage cable is normally used as the neutral return conductor, but the third high-voltage cable is capable of being connected in parallel with, or instead of, any of the other three cables, giving a large number of possible operating modes.The converter stations use Line-Commutated Converters with a conventional arrangement of a single Twelve-pulse bridge per pole.".
- Jindo–Jeju_HVDC_system wikiPageID "48589334".
- Jindo–Jeju_HVDC_system wikiPageLength "4467".
- Jindo–Jeju_HVDC_system wikiPageOutDegree "24".
- Jindo–Jeju_HVDC_system wikiPageRevisionID "691350128".
- Jindo–Jeju_HVDC_system wikiPageWikiLink Alstom.
- Jindo–Jeju_HVDC_system wikiPageWikiLink Category:Converter_stations.
- Jindo–Jeju_HVDC_system wikiPageWikiLink Category:HVDC_transmission_lines.
- Jindo–Jeju_HVDC_system wikiPageWikiLink Cross-linked_polyethylene.
- Jindo–Jeju_HVDC_system wikiPageWikiLink HVDC_Haenam–Cheju.
- Jindo–Jeju_HVDC_system wikiPageWikiLink HVDC_converter.
- Jindo–Jeju_HVDC_system wikiPageWikiLink HVDC_converter_station.
- Jindo–Jeju_HVDC_system wikiPageWikiLink High-voltage_direct_current.
- Jindo–Jeju_HVDC_system wikiPageWikiLink Jejudo.
- Jindo–Jeju_HVDC_system wikiPageWikiLink Jindo_(island).
- Jindo–Jeju_HVDC_system wikiPageWikiLink Korea.
- Jindo–Jeju_HVDC_system wikiPageWikiLink Korea_Electric_Power_Corporation.
- Jindo–Jeju_HVDC_system wikiPageWikiLink Korean_Peninsula.
- Jindo–Jeju_HVDC_system wikiPageWikiLink LS_Group.
- Jindo–Jeju_HVDC_system wikiPageWikiLink South_Korea.
- Jindo–Jeju_HVDC_system wikiPageWikiLink Submarine_power_cable.
- Jindo–Jeju_HVDC_system wikiPageWikiLinkText "Jindo - Jeju".
- Jindo–Jeju_HVDC_system wikiPageWikiLinkText "Jindo–Jeju HVDC system".
- Jindo–Jeju_HVDC_system cableManufacturer LS_Group.
- Jindo–Jeju_HVDC_system capacity "400.0".
- Jindo–Jeju_HVDC_system country Korea.
- Jindo–Jeju_HVDC_system currentType High-voltage_direct_current.
- Jindo–Jeju_HVDC_system dcVoltage "±250 kV".
- Jindo–Jeju_HVDC_system est "2014".
- Jindo–Jeju_HVDC_system finish Jejudo.
- Jindo–Jeju_HVDC_system lengthKm "105".
- Jindo–Jeju_HVDC_system mapCaption "Location of Jindo–Jeju HVDC system".
- Jindo–Jeju_HVDC_system name "Jindo–Jeju HVDC system".
- Jindo–Jeju_HVDC_system owner Korea_Electric_Power_Corporation.
- Jindo–Jeju_HVDC_system polesNo "2".
- Jindo–Jeju_HVDC_system start Jindo_(island).
- Jindo–Jeju_HVDC_system substationManufacturer "Alstom Grid".
- Jindo–Jeju_HVDC_system type "Transmission".
- Jindo–Jeju_HVDC_system wikiPageUsesTemplate Template:Coord.
- Jindo–Jeju_HVDC_system wikiPageUsesTemplate Template:GeoGroupTemplate.
- Jindo–Jeju_HVDC_system wikiPageUsesTemplate Template:Infobox_power_transmission_line.
- Jindo–Jeju_HVDC_system wikiPageUsesTemplate Template:Powerline-stub.
- Jindo–Jeju_HVDC_system wikiPageUsesTemplate Template:Reflist.
- Jindo–Jeju_HVDC_system subject Category:Converter_stations.
- Jindo–Jeju_HVDC_system subject Category:HVDC_transmission_lines.
- Jindo–Jeju_HVDC_system hypernym Connection.
- Jindo–Jeju_HVDC_system point "34.385555555555555 126.47333333333333".
- Jindo–Jeju_HVDC_system type Road.
- Jindo–Jeju_HVDC_system type SpatialThing.
- Jindo–Jeju_HVDC_system comment "The Jindo–Jeju HVDC system is a 105 km HVDC submarine cable connection in South Korea between the island of Jindo, close to the Korean Peninsula, and the more distant island of Jeju. The system has a capacity of 400 MW and transmission voltage of ±250 kV and was put into service in 2014.".
- Jindo–Jeju_HVDC_system label "Jindo–Jeju HVDC system".
- Jindo–Jeju_HVDC_system lat "34.385555555555555".
- Jindo–Jeju_HVDC_system long "126.47333333333333".
- Jindo–Jeju_HVDC_system wasDerivedFrom Jindo–Jeju_HVDC_system?oldid=691350128.
- Jindo–Jeju_HVDC_system isPrimaryTopicOf Jindo–Jeju_HVDC_system.