Matches in DBpedia 2016-04 for { <http://dbpedia.org/resource/High-speed_rail_in_Croatia> ?p ?o }
Showing triples 1 to 28 of
28
with 100 triples per page.
- High-speed_rail_in_Croatia abstract "With the highway construction programme in its final stages, the Croatian Parliament has passed a bill to build its first high-speed line, a new Botovo–Zagreb–Rijeka line, with an initial maximum planned speed of 250 km/h. Initially, however, the train will not exceed 200 km/h due to a signaling system which can only accommodate speeds up to 200 km/h. The cost of the new line is estimated at 9,244,200,000 kuna (approx. 1.6 bil USD). The project will include the modernisation of the current Botovo-Zagreb line and a construction of a completely new line between Zagreb and Rijeka.Also, the Pan-European Corridor X, running from the Slovenian border, through Zagreb, to Serbian border is a likely future candidate for the high-speed extension to this line. It is the most modern Croatian track, already initially built for 160 km/h and fully electrified and connects most branch lines in Croatia, rapidly growing Croatian cities of Slavonski Brod and Vinkovci, and Pan-European Corridor Vc towards Osijek and Bosnia and Herzegovina.".
- High-speed_rail_in_Croatia wikiPageID "46314620".
- High-speed_rail_in_Croatia wikiPageLength "1720".
- High-speed_rail_in_Croatia wikiPageOutDegree "13".
- High-speed_rail_in_Croatia wikiPageRevisionID "656128039".
- High-speed_rail_in_Croatia wikiPageWikiLink Bosnia_and_Herzegovina.
- High-speed_rail_in_Croatia wikiPageWikiLink Botovo,_Croatia.
- High-speed_rail_in_Croatia wikiPageWikiLink Category:High-speed_rail_by_country.
- High-speed_rail_in_Croatia wikiPageWikiLink Category:High-speed_rail_in_Europe.
- High-speed_rail_in_Croatia wikiPageWikiLink Category:Rail_transport_in_Croatia.
- High-speed_rail_in_Croatia wikiPageWikiLink Croatian_Parliament.
- High-speed_rail_in_Croatia wikiPageWikiLink European_route_E73.
- High-speed_rail_in_Croatia wikiPageWikiLink Osijek.
- High-speed_rail_in_Croatia wikiPageWikiLink Pan-European_Corridor_X.
- High-speed_rail_in_Croatia wikiPageWikiLink Rijeka.
- High-speed_rail_in_Croatia wikiPageWikiLink Slavonski_Brod.
- High-speed_rail_in_Croatia wikiPageWikiLink Vinkovci.
- High-speed_rail_in_Croatia wikiPageWikiLink Zagreb.
- High-speed_rail_in_Croatia wikiPageUsesTemplate Template:High-speed_rail.
- High-speed_rail_in_Croatia wikiPageUsesTemplate Template:Reflist.
- High-speed_rail_in_Croatia subject Category:High-speed_rail_by_country.
- High-speed_rail_in_Croatia subject Category:High-speed_rail_in_Europe.
- High-speed_rail_in_Croatia subject Category:Rail_transport_in_Croatia.
- High-speed_rail_in_Croatia comment "With the highway construction programme in its final stages, the Croatian Parliament has passed a bill to build its first high-speed line, a new Botovo–Zagreb–Rijeka line, with an initial maximum planned speed of 250 km/h. Initially, however, the train will not exceed 200 km/h due to a signaling system which can only accommodate speeds up to 200 km/h. The cost of the new line is estimated at 9,244,200,000 kuna (approx. 1.6 bil USD).".
- High-speed_rail_in_Croatia label "High-speed rail in Croatia".
- High-speed_rail_in_Croatia sameAs m.0131vdt5.
- High-speed_rail_in_Croatia wasDerivedFrom High-speed_rail_in_Croatia?oldid=656128039.
- High-speed_rail_in_Croatia isPrimaryTopicOf High-speed_rail_in_Croatia.