Matches in DBpedia 2016-04 for { <http://dbpedia.org/resource/Earned_schedule> ?p ?o }
Showing triples 1 to 26 of
26
with 100 triples per page.
- Earned_schedule wikiPageExternalLink v_itemcatg.asp?P=31&ICID=105&.
- Earned_schedule wikiPageExternalLink www.earnedschedule.com.
- Earned_schedule wikiPageID "4397585".
- Earned_schedule wikiPageLength "2794".
- Earned_schedule wikiPageOutDegree "5".
- Earned_schedule wikiPageRevisionID "654313194".
- Earned_schedule wikiPageWikiLink Category:Management.
- Earned_schedule wikiPageWikiLink Category:Project_management.
- Earned_schedule wikiPageWikiLink Earned_value_management.
- Earned_schedule wikiPageWikiLink Project_Management_Institute.
- Earned_schedule wikiPageWikiLinkText "Earned schedule".
- Earned_schedule wikiPageWikiLinkText "earned schedule".
- Earned_schedule subject Category:Management.
- Earned_schedule subject Category:Project_management.
- Earned_schedule hypernym Extension.
- Earned_schedule type Software.
- Earned_schedule type Redirect.
- Earned_schedule type Science.
- Earned_schedule comment "Earned schedule (ES) is an extension to the theory and practice of earned value management (EVM). As of 2005, Earned Schedule is designated as an \"emerging practice\" by the Project Management Institute. It was introduced in 2003 a seminal article \"Schedule is Different\" by Walter Lipke, in The Measurable News, the quarterly magazine of the College of Performance Management, of the Project Management Institute.".
- Earned_schedule label "Earned schedule".
- Earned_schedule sameAs Q5326923.
- Earned_schedule sameAs جدول_مكتسبات.
- Earned_schedule sameAs m.0c01c4.
- Earned_schedule sameAs Q5326923.
- Earned_schedule wasDerivedFrom Earned_schedule?oldid=654313194.
- Earned_schedule isPrimaryTopicOf Earned_schedule.