Matches in DBpedia 2016-04 for { <http://dbpedia.org/resource/Change_request> ?p ?o }
Showing triples 1 to 47 of
47
with 100 triples per page.
- Change_request abstract "A change request is a document containing a call for an adjustment of a system; it is of great importance in the change management process.A change request is declarative, i.e. it states what needs to be accomplished, but leaves out how the change should be carried out. Important elements of a change request are an ID, the customer (ID), the deadline (if applicable), an indication whether the change is required or optional, the change type (often chosen from a domain-specific ontology) and a change abstract, which is a piece of narrative (Keller, 2005). An example of a change request can be found in Figure 1 on the right.Change requests typically originate from one of five sources: problem reports that identify bugs that must be fixed, which forms the most common source system enhancement requests from users events in the development of other systems changes in underlying structure and or standards (e.g. in software development this could be a new operating system) demands from senior management (Dennis, Wixom & Tegarden, 2002).Additionally, in Project Management, change requests may also originate from an unclear understanding of the goals and the objectives of the project.Change requests have many different names, which essentially describe the same concept: Request For Change (RFC) by Rajlich (1999); RFC is also a common term in ITIL (Keller, 2005) and PRINCE2 (Onna & Koning, 2003). Engineering Change (EC) by Huang and Mak (1999); Engineering Change Request (ECR) at Aero (Helms, 2002); Engineering Change Order (ECO) by Loch and Terwiesch (1999) and Pikosz and Malmqvist (1998). Engineering Change Order is a separate step after ECR. After ECR is approved by Engineering Department then an ECO is made for making the change; Change Notice at Chemical (Helms, 2002); Action Request (AR) at ABB Robotics AB (Kajko-Mattson, 1999); Change Request (CR) is, among others, used by Lam (1998), Mäkäräinen (2000), Dennis, et al. (2002), Crnkovic, Asklund and Persson-Dahlqvist (2003) and at ABB Automation Products AB (Kajko-Mattsson, 1999). Operational Change Request (OCR). Enterprise Change Request (ECR).↑".
- Change_request thumbnail Example_change_request.png?width=300.
- Change_request wikiPageExternalLink 200211339.pdf..
- Change_request wikiPageExternalLink P416.pdf..
- Change_request wikiPageID "3919967".
- Change_request wikiPageLength "5247".
- Change_request wikiPageOutDegree "17".
- Change_request wikiPageRevisionID "654637320".
- Change_request wikiPageWikiLink Abstract_(summary).
- Change_request wikiPageWikiLink Category:Systems_engineering.
- Change_request wikiPageWikiLink Change_control.
- Change_request wikiPageWikiLink Change_management_(engineering).
- Change_request wikiPageWikiLink Change_order.
- Change_request wikiPageWikiLink Document.
- Change_request wikiPageWikiLink Engineering_change_order.
- Change_request wikiPageWikiLink ITIL.
- Change_request wikiPageWikiLink Ontology_(information_science).
- Change_request wikiPageWikiLink PRINCE2.
- Change_request wikiPageWikiLink Project_management.
- Change_request wikiPageWikiLink Software_bug.
- Change_request wikiPageWikiLink System.
- Change_request wikiPageWikiLink Time_limit.
- Change_request wikiPageWikiLink User_(computing).
- Change_request wikiPageWikiLink File:Example_change_request.png.
- Change_request wikiPageWikiLinkText "CHANGE REQUEST".
- Change_request wikiPageWikiLinkText "Change Request".
- Change_request wikiPageWikiLinkText "Change request".
- Change_request wikiPageWikiLinkText "Request for enhancement".
- Change_request wikiPageWikiLinkText "change request".
- Change_request wikiPageWikiLinkText "change".
- Change_request wikiPageUsesTemplate Template:More_footnotes.
- Change_request wikiPageUsesTemplate Template:Reflist.
- Change_request subject Category:Systems_engineering.
- Change_request hypernym Document.
- Change_request type Book.
- Change_request type Discipline.
- Change_request comment "A change request is a document containing a call for an adjustment of a system; it is of great importance in the change management process.A change request is declarative, i.e. it states what needs to be accomplished, but leaves out how the change should be carried out.".
- Change_request label "Change request".
- Change_request sameAs Q255104.
- Change_request sameAs Änderungsanforderung.
- Change_request sameAs Programmatūras_izmaiņu_pieprasījums.
- Change_request sameAs Change_request.
- Change_request sameAs m.0b6tk0.
- Change_request sameAs Q255104.
- Change_request wasDerivedFrom Change_request?oldid=654637320.
- Change_request depiction Example_change_request.png.
- Change_request isPrimaryTopicOf Change_request.