Matches in DBpedia 2016-04 for { <http://dbpedia.org/resource/Building_enclosure_commissioning> ?p ?o }
Showing triples 1 to 18 of
18
with 100 triples per page.
- Building_enclosure_commissioning abstract "Building Enclosure Commissioning (BECx) (sometimes 'envelope' is used instead of 'enclosure') is a strict quality-focused process wherein the energy performance of a facility, system or assembly is evaluated and verified against defined objectives and criteria. The process itself is carried out by a commissioning team which uses reliable and accurate measures to verify that the project is meeting specific quality requirements outlined by the owner of the project. The commissioning process begins at project inception and runs through different construction phases, which include a pre-design phase, pre-construction phase and construction phase. Once the construction is finished, the commissioning process continues and becomes an ongoing routine in the life of the facility. Specific information regarding the commissioning process is outlined in the ASHRAE Guideline 0-2005: The Commissioning Process. This and several other technical support guidelines to the Guideline 0-2005 document provide specific information related to the commissioning process.Typical Commissioning Objectives: Heat Flow Air Flow Noise Fire Light Infrared Ultraviolet Rain Penetration Moisture structural performance Durability Security Reliability Aesthetics Value Constructability Maintainability Sustainability↑".
- Building_enclosure_commissioning wikiPageID "32910374".
- Building_enclosure_commissioning wikiPageLength "2530".
- Building_enclosure_commissioning wikiPageOutDegree "3".
- Building_enclosure_commissioning wikiPageRevisionID "664712333".
- Building_enclosure_commissioning wikiPageWikiLink Building_envelope.
- Building_enclosure_commissioning wikiPageWikiLink Building_services_engineering.
- Building_enclosure_commissioning wikiPageWikiLink National_Institute_of_Building_Sciences.
- Building_enclosure_commissioning wikiPageWikiLinkText "Building enclosure commissioning".
- Building_enclosure_commissioning hypernym Process.
- Building_enclosure_commissioning type Election.
- Building_enclosure_commissioning comment "Building Enclosure Commissioning (BECx) (sometimes 'envelope' is used instead of 'enclosure') is a strict quality-focused process wherein the energy performance of a facility, system or assembly is evaluated and verified against defined objectives and criteria. The process itself is carried out by a commissioning team which uses reliable and accurate measures to verify that the project is meeting specific quality requirements outlined by the owner of the project.".
- Building_enclosure_commissioning label "Building enclosure commissioning".
- Building_enclosure_commissioning sameAs Q4986587.
- Building_enclosure_commissioning sameAs m.0h3qlqw.
- Building_enclosure_commissioning sameAs Q4986587.
- Building_enclosure_commissioning wasDerivedFrom Building_enclosure_commissioning?oldid=664712333.
- Building_enclosure_commissioning isPrimaryTopicOf Building_enclosure_commissioning.