Matches in DBpedia 2016-04 for { <http://dbpedia.org/resource/Basalt_Waste_Isolation_Project> ?p ?o }
Showing triples 1 to 30 of
30
with 100 triples per page.
- Basalt_Waste_Isolation_Project abstract "The Basalt Waste Isolation Project (BWIP) broke ground at Hanford Site in 1976, conducting tests aimed at siting a safe and isolated repository for reactor irradiated fuel and other nuclear byproducts. Between 1976 and enactment of the Nuclear Waste Policy Act of 1982 (NWPA), studies at the Hanford site continued to evaluate the geologic and hydrologic suitability of the BWIP repository in the underlying basalt. The BWIP Site Characterization Report was published in November 1982, explaining the details and status of the project. When the Department of Energy (DOE) published an Environmental Assessment in May 1986, it recommended BWIP to the President as a candidate site.The main concern in the post-1982 phase of the project had been the suitability of the project's quality assurance procedures during the early phases of BWIP. President Reagan approved BWIP as a candidate site in May 1986, and DOE stopped most of the site characterization activities at the BWIP until quality assurance procedures could be adopted that would satisfy Nuclear Regulatory Commission (NRC) requirements.BWIP's status as a candidate site was short lived. Only 19 months after the President approved the BWIP as a candidate site for the repository, Congress amended the NWPA in Title V of the Omnibus Budget Reconciliation Act of 1987. This narrowed the search for a repository site by designating Yucca Mountain as the sole candidate. DOE was directed to terminate all BWIP activities within 90 days after December 22, 1987.".
- Basalt_Waste_Isolation_Project wikiPageID "26701458".
- Basalt_Waste_Isolation_Project wikiPageLength "1924".
- Basalt_Waste_Isolation_Project wikiPageOutDegree "10".
- Basalt_Waste_Isolation_Project wikiPageRevisionID "641301046".
- Basalt_Waste_Isolation_Project wikiPageWikiLink By-product.
- Basalt_Waste_Isolation_Project wikiPageWikiLink Category:Radioactive_waste_repositories.
- Basalt_Waste_Isolation_Project wikiPageWikiLink Fuel.
- Basalt_Waste_Isolation_Project wikiPageWikiLink Hanford_Site.
- Basalt_Waste_Isolation_Project wikiPageWikiLink Nuclear_Regulatory_Commission.
- Basalt_Waste_Isolation_Project wikiPageWikiLink Nuclear_Waste_Policy_Act.
- Basalt_Waste_Isolation_Project wikiPageWikiLink Omnibus_Budget_Reconciliation_Act_of_1987.
- Basalt_Waste_Isolation_Project wikiPageWikiLink Ronald_Reagan.
- Basalt_Waste_Isolation_Project wikiPageWikiLink United_States_Department_of_Energy.
- Basalt_Waste_Isolation_Project wikiPageWikiLink Yucca_Mountain.
- Basalt_Waste_Isolation_Project wikiPageWikiLinkText "Basalt Waste Isolation Project".
- Basalt_Waste_Isolation_Project wikiPageUsesTemplate Template:Multiple_issues.
- Basalt_Waste_Isolation_Project wikiPageUsesTemplate Template:Notability.
- Basalt_Waste_Isolation_Project wikiPageUsesTemplate Template:Orphan.
- Basalt_Waste_Isolation_Project subject Category:Radioactive_waste_repositories.
- Basalt_Waste_Isolation_Project type Company.
- Basalt_Waste_Isolation_Project type Company.
- Basalt_Waste_Isolation_Project type Facility.
- Basalt_Waste_Isolation_Project comment "The Basalt Waste Isolation Project (BWIP) broke ground at Hanford Site in 1976, conducting tests aimed at siting a safe and isolated repository for reactor irradiated fuel and other nuclear byproducts. Between 1976 and enactment of the Nuclear Waste Policy Act of 1982 (NWPA), studies at the Hanford site continued to evaluate the geologic and hydrologic suitability of the BWIP repository in the underlying basalt.".
- Basalt_Waste_Isolation_Project label "Basalt Waste Isolation Project".
- Basalt_Waste_Isolation_Project sameAs Q4866204.
- Basalt_Waste_Isolation_Project sameAs m.0bmb7c7.
- Basalt_Waste_Isolation_Project sameAs Q4866204.
- Basalt_Waste_Isolation_Project wasDerivedFrom Basalt_Waste_Isolation_Project?oldid=641301046.
- Basalt_Waste_Isolation_Project isPrimaryTopicOf Basalt_Waste_Isolation_Project.