Matches in DBpedia 2015-10 for { <http://dbpedia.org/resource/Sequence-dependent_setup> ?p ?o }
Showing triples 1 to 35 of
35
with 100 triples per page.
- Sequence-dependent_setup abstract "In Job Shop Scheduling, sequence-dependent setup occurs when a machine's setup time or cost for a particular job is determined by not only by that job but also by the previous job that the machine is currently setup for. Information on sequence-dependent setup times or costs for N jobs can be stored in a N-by-N matrix with all diagonal entries being zero. Diagonal entries must be zero since they correspond to the condition that the machine is already setup for the next job; hence the setup time and/or cost is zero.In a job shop, we are usually concerned with completing all of the jobs in the shortest possible time or least possible cost. The time it takes to complete all of the jobs is called Makespan. If set up time or cost does not exist, or is not sequence-dependent, then in a single machine N-job situation, the makespan or total cost is not sequence-dependent. However, when set up times or costs are sequence-dependent, makespan or total cost too becomes variable. The size and complexity of the problem grow rapidly as the number of jobs and machines in the problem increase.".
- Sequence-dependent_setup wikiPageID "21025223".
- Sequence-dependent_setup wikiPageLength "1460".
- Sequence-dependent_setup wikiPageOutDegree "8".
- Sequence-dependent_setup wikiPageRevisionID "670292845".
- Sequence-dependent_setup wikiPageWikiLink Category:Operations_research.
- Sequence-dependent_setup wikiPageWikiLink Category:Optimization_algorithms_and_methods.
- Sequence-dependent_setup wikiPageWikiLink Category:Production_and_organizations.
- Sequence-dependent_setup wikiPageWikiLink Changeover.
- Sequence-dependent_setup wikiPageWikiLink Genetic_algorithm_scheduling.
- Sequence-dependent_setup wikiPageWikiLink Job_Shop_Scheduling.
- Sequence-dependent_setup wikiPageWikiLink Job_shop_scheduling.
- Sequence-dependent_setup wikiPageWikiLink Matrix_(mathematics).
- Sequence-dependent_setup wikiPageWikiLink Single-Minute_Exchange_of_Die.
- Sequence-dependent_setup wikiPageWikiLinkText "Sequence-dependent setup".
- Sequence-dependent_setup wikiPageWikiLinkText "sequence-dependent setup".
- Sequence-dependent_setup wikiPageWikiLinkText "sequence-dependent".
- Sequence-dependent_setup hasPhotoCollection Sequence-dependent_setup.
- Sequence-dependent_setup wikiPageUsesTemplate Template:Industry-stub.
- Sequence-dependent_setup wikiPageUsesTemplate Template:Notability.
- Sequence-dependent_setup wikiPageUsesTemplate Template:Unreferenced.
- Sequence-dependent_setup subject Category:Operations_research.
- Sequence-dependent_setup subject Category:Optimization_algorithms_and_methods.
- Sequence-dependent_setup subject Category:Production_and_organizations.
- Sequence-dependent_setup type Algorithm.
- Sequence-dependent_setup type Discipline.
- Sequence-dependent_setup type Field.
- Sequence-dependent_setup type Microeconomic.
- Sequence-dependent_setup comment "In Job Shop Scheduling, sequence-dependent setup occurs when a machine's setup time or cost for a particular job is determined by not only by that job but also by the previous job that the machine is currently setup for. Information on sequence-dependent setup times or costs for N jobs can be stored in a N-by-N matrix with all diagonal entries being zero.".
- Sequence-dependent_setup label "Sequence-dependent setup".
- Sequence-dependent_setup sameAs m.05b5vzz.
- Sequence-dependent_setup sameAs Q17037362.
- Sequence-dependent_setup sameAs Q17037362.
- Sequence-dependent_setup wasDerivedFrom Sequence-dependent_setup?oldid=670292845.
- Sequence-dependent_setup isPrimaryTopicOf Sequence-dependent_setup.