Matches in DBpedia 2015-10 for { <http://dbpedia.org/resource/GASUN> ?p ?o }
Showing triples 1 to 67 of
67
with 100 triples per page.
- GASUN abstract "The National Unification Gas Pipeline (Gas Unificação – GASUN) will be a 5,000-kilometre (3,100 mi) natural gas pipeline in Brazil. GASUN will connect the Gasbol pipeline with the northern Amazon and the Northeast states (Pará, Tocantins, Maranhão and Piauí) allowing transportation of Bolivian gas into these regions. The project is expected to cost US$2.48 billion.The first stage of GASUN will begin in Mimoso, Mato Grosso do Sul, and will join the Gasbol pipeline. From there it will run towards Brasília, passing through Goiânia. Construction of this section started in 2005, and scheduled to be completed in 2007.The longest and most costly portion of GASUN will be the 2,260 kilometres (1,400 mi) long central-north branch, which is to connect Goiás and Maranhão. It will pass through Palmas and Belém, Pará. The entire natural gas pipeline should be complete by 2026.".
- GASUN wikiPageID "11190015".
- GASUN wikiPageLength "2382".
- GASUN wikiPageOutDegree "32".
- GASUN wikiPageRevisionID "676496295".
- GASUN wikiPageWikiLink Amazon_Basin.
- GASUN wikiPageWikiLink Amazon_basin.
- GASUN wikiPageWikiLink Belém.
- GASUN wikiPageWikiLink Bolivia.
- GASUN wikiPageWikiLink Brasília.
- GASUN wikiPageWikiLink Brazil.
- GASUN wikiPageWikiLink Category:Energy_infrastructure_under_construction.
- GASUN wikiPageWikiLink Category:Natural_gas_pipelines_in_Brazil.
- GASUN wikiPageWikiLink Category:Proposed_pipelines_in_South_America.
- GASUN wikiPageWikiLink GASBOL.
- GASUN wikiPageWikiLink Gasbol_pipeline.
- GASUN wikiPageWikiLink Goiás.
- GASUN wikiPageWikiLink Goiânia.
- GASUN wikiPageWikiLink Maranhão.
- GASUN wikiPageWikiLink Mato_Grosso_do_Sul.
- GASUN wikiPageWikiLink Natural_gas.
- GASUN wikiPageWikiLink Palmas,_Tocantins.
- GASUN wikiPageWikiLink Pará.
- GASUN wikiPageWikiLink Petrobras.
- GASUN wikiPageWikiLink Piauí.
- GASUN wikiPageWikiLink Tocantins.
- GASUN wikiPageWikiLinkText "GASUN".
- GASUN wikiPageWikiLinkText "Gas Unificação (Gasun pipeline)".
- GASUN country Brazil.
- GASUN expected "2026".
- GASUN finish Maranhão.
- GASUN hasPhotoCollection GASUN.
- GASUN lengthKm "5000".
- GASUN mapCaption "Gas Unificação".
- GASUN mapCaption "Location of GASUN".
- GASUN name "GASUN".
- GASUN name "Gas Unificação".
- GASUN operator Petrobras.
- GASUN start "Mimoso, Mato Grosso do Sul".
- GASUN state Goiás.
- GASUN state Maranhão.
- GASUN state Mato_Grosso_do_Sul.
- GASUN state Pará.
- GASUN state Piauí.
- GASUN state Tocantins.
- GASUN through "Goiânia, Palmas, Belém".
- GASUN type Natural_gas.
- GASUN wikiPageUsesTemplate Template:Brazil-stub.
- GASUN wikiPageUsesTemplate Template:Convert.
- GASUN wikiPageUsesTemplate Template:Infobox_pipeline.
- GASUN wikiPageUsesTemplate Template:Pipeline-stub.
- GASUN wikiPageUsesTemplate Template:Reflist.
- GASUN wikiPageUsesTemplate Template:Update.
- GASUN subject Category:Energy_infrastructure_under_construction.
- GASUN subject Category:Natural_gas_pipelines_in_Brazil.
- GASUN subject Category:Proposed_pipelines_in_South_America.
- GASUN type Article.
- GASUN type Dam.
- GASUN type Article.
- GASUN type Dam.
- GASUN comment "The National Unification Gas Pipeline (Gas Unificação – GASUN) will be a 5,000-kilometre (3,100 mi) natural gas pipeline in Brazil. GASUN will connect the Gasbol pipeline with the northern Amazon and the Northeast states (Pará, Tocantins, Maranhão and Piauí) allowing transportation of Bolivian gas into these regions. The project is expected to cost US$2.48 billion.The first stage of GASUN will begin in Mimoso, Mato Grosso do Sul, and will join the Gasbol pipeline.".
- GASUN label "GASUN".
- GASUN sameAs m.02r32xf.
- GASUN sameAs Q5512891.
- GASUN sameAs Q5512891.
- GASUN wasDerivedFrom GASUN?oldid=676496295.
- GASUN isPrimaryTopicOf GASUN.