Matches in DBpedia 2015-10 for { <http://dbpedia.org/resource/Assabet_River_Rail_Trail> ?p ?o }
Showing triples 1 to 46 of
46
with 100 triples per page.
- Assabet_River_Rail_Trail abstract "The Assabet River Rail Trail is a multi-use path under construction in Marlborough, Hudson, Stow, Maynard, and Acton in Massachusetts. As a conversion of the abandoned Marlborough Branch of the Fitchburg Railroad, it is a rail trail. When completed, the end-to-end length will be 12.5 miles (20.1 km). The right-of-way parallels the Assabet River in the midsection; at the north end it veers north to the South Acton train station, and the south end veers south to Marlborough.This railroad branch was progressively lengthened, so that it reached from the Acton station to Maynard by 1849, was extended through Stow to Hudson in 1850, and reached its Marlborough terminus in 1855. Decades later, passenger service was discontinued in the reverse fashion, so that Marlborough's service ended in 1930, Hudson and Stow in 1939, and finally Maynard in 1958. The branch continued to provide freight service into the 1960s. The last remaining rails in Acton and North Maynard were removed in 2014.As of 2013, ARRT is partially paved: from a Route 62 parking lot in north Hudson, southwards to Marlborough. The north end (Acton train station to center of Maynard) is a rough trail. Parts can be managed on a mountain bike while other parts still have the railroad ties and rails in place, thus walkable but not bikeable. Two short sections in Maynard have woodchip fill between the rails. From the west side of Maynard into Stow the trail is a wide dirt road known locally as Track Road - this borders the Assabet River National Wildlife Refuge. The section from a bit west of Sudbury Road in Stow to Route 62 in Hudson cannot be traveled by any means. There are no bridges over the two crossings of the Assabet River and much of this section is private property. See maps and updates at the ARRT website.Construction of 3.4 miles of the north end (from the Acton train station south and west to White Pond Road, which is at the Maynard:Stow border) is tentatively scheduled to begin in 2016. Final design plans are on the ARRT website. When completed, this will be twelve feet wide paved with cleared shoulders two feet wide.Between five and ten geocaches are in place along the paved (southwest) part of ARRT.".
- Assabet_River_Rail_Trail thumbnail Assabet_River_Rail_Trail_south_of_Washington_St,_Hudson_MA.jpg?width=300.
- Assabet_River_Rail_Trail wikiPageExternalLink www.arrtinc.org.
- Assabet_River_Rail_Trail wikiPageID "23182829".
- Assabet_River_Rail_Trail wikiPageLength "2970".
- Assabet_River_Rail_Trail wikiPageOutDegree "14".
- Assabet_River_Rail_Trail wikiPageRevisionID "681354835".
- Assabet_River_Rail_Trail wikiPageWikiLink Acton,_Massachusetts.
- Assabet_River_Rail_Trail wikiPageWikiLink Assabet_River.
- Assabet_River_Rail_Trail wikiPageWikiLink Category:Protected_areas_of_Middlesex_County,_Massachusetts.
- Assabet_River_Rail_Trail wikiPageWikiLink Category:Rail_trails_in_Massachusetts.
- Assabet_River_Rail_Trail wikiPageWikiLink Fitchburg_Railroad.
- Assabet_River_Rail_Trail wikiPageWikiLink Geocaching.
- Assabet_River_Rail_Trail wikiPageWikiLink Hudson,_Massachusetts.
- Assabet_River_Rail_Trail wikiPageWikiLink Marlborough,_Massachusetts.
- Assabet_River_Rail_Trail wikiPageWikiLink Massachusetts.
- Assabet_River_Rail_Trail wikiPageWikiLink Maynard,_Massachusetts.
- Assabet_River_Rail_Trail wikiPageWikiLink Multi-use_path.
- Assabet_River_Rail_Trail wikiPageWikiLink Rail_trail.
- Assabet_River_Rail_Trail wikiPageWikiLink Shared_use_path.
- Assabet_River_Rail_Trail wikiPageWikiLink Stow,_Massachusetts.
- Assabet_River_Rail_Trail wikiPageWikiLink File:Assabet_River_Rail_Trail_south_of_Washington_St,_Hudson_MA.jpg.
- Assabet_River_Rail_Trail wikiPageWikiLinkText "Assabet River Rail Trail".
- Assabet_River_Rail_Trail hasPhotoCollection Assabet_River_Rail_Trail.
- Assabet_River_Rail_Trail wikiPageUsesTemplate Template:Commonscat.
- Assabet_River_Rail_Trail wikiPageUsesTemplate Template:Coord.
- Assabet_River_Rail_Trail wikiPageUsesTemplate Template:Reflist.
- Assabet_River_Rail_Trail subject Category:Protected_areas_of_Middlesex_County,_Massachusetts.
- Assabet_River_Rail_Trail subject Category:Rail_trails_in_Massachusetts.
- Assabet_River_Rail_Trail hypernym Path.
- Assabet_River_Rail_Trail point "42.388194444444444 -71.56527777777778".
- Assabet_River_Rail_Trail type Area.
- Assabet_River_Rail_Trail type Place.
- Assabet_River_Rail_Trail type Area.
- Assabet_River_Rail_Trail type Attraction.
- Assabet_River_Rail_Trail type SpatialThing.
- Assabet_River_Rail_Trail comment "The Assabet River Rail Trail is a multi-use path under construction in Marlborough, Hudson, Stow, Maynard, and Acton in Massachusetts. As a conversion of the abandoned Marlborough Branch of the Fitchburg Railroad, it is a rail trail. When completed, the end-to-end length will be 12.5 miles (20.1 km).".
- Assabet_River_Rail_Trail label "Assabet River Rail Trail".
- Assabet_River_Rail_Trail sameAs m.064mm7_.
- Assabet_River_Rail_Trail sameAs Q4808311.
- Assabet_River_Rail_Trail sameAs Q4808311.
- Assabet_River_Rail_Trail lat "42.388194444444444".
- Assabet_River_Rail_Trail long "-71.56527777777778".
- Assabet_River_Rail_Trail wasDerivedFrom Assabet_River_Rail_Trail?oldid=681354835.
- Assabet_River_Rail_Trail depiction Assabet_River_Rail_Trail_south_of_Washington_St,_Hudson_MA.jpg.
- Assabet_River_Rail_Trail isPrimaryTopicOf Assabet_River_Rail_Trail.