Matches in DBpedia 2016-04 for { <http://www.kgs.ku.edu/Publications/Oil/primer12.html> ?p ?o }
Showing triples 1 to 14 of
14
with 100 triples per page.
- primer12.html accessdate "2011-04-18".
- primer12.html author2 "Watney, W.L.".
- primer12.html author3 "Steeples, D.W.".
- primer12.html author4 "Brostuen, E.A".
- primer12.html edition "Educational Series, no. 7".
- primer12.html first "D.L.".
- primer12.html isCitedBy Drilling_rig.
- primer12.html last "Baars".
- primer12.html pages "40".
- primer12.html publisher "Kansas Geological Survey".
- primer12.html quote "After the cementing of the casing has been completed, the drilling rig, equipment, and materials are removed from the drill site. A smaller rig, known as a workover rig or completion rig, is moved over the well bore. The smaller rig is used for the remaining completion operations.".
- primer12.html title "Petroleum; a primer for Kansas".
- primer12.html url "http://www.kgs.ku.edu/Publications/Oil/primer12.html".
- primer12.html year "1989".