Matches in DBpedia 2016-04 for { <http://www.gibbsbridge.org/ProjectLibrary/BikePed_ProjectionsReport_8.26.08.pdf> ?p ?o }
Showing triples 1 to 9 of
9
with 100 triples per page.
- BikePed_ProjectionsReport_8.26.08.pdf accessdate "2012-11-05".
- BikePed_ProjectionsReport_8.26.08.pdf author "Mike Tresidder".
- BikePed_ProjectionsReport_8.26.08.pdf coauthors "Kim Voros, Hannah Kapell and Mia Birk, Alta Planning + Design".
- BikePed_ProjectionsReport_8.26.08.pdf date "2008-08-26".
- BikePed_ProjectionsReport_8.26.08.pdf format "pdf".
- BikePed_ProjectionsReport_8.26.08.pdf isCitedBy Gibbs_Street_Pedestrian_Bridge.
- BikePed_ProjectionsReport_8.26.08.pdf pages "14–15, table 13".
- BikePed_ProjectionsReport_8.26.08.pdf title "Gibbs Street Pedestrian Bridge – Existing and Future Bicycle and Pedestrian Demand".
- BikePed_ProjectionsReport_8.26.08.pdf url BikePed_ProjectionsReport_8.26.08.pdf.