Matches in DBpedia 2016-04 for { <http://wikidata.dbpedia.org/resource/Q809109> ?p ?o }
Showing triples 1 to 40 of
40
with 100 triples per page.
- Q809109 subject Q13264666.
- Q809109 subject Q8513681.
- Q809109 subject Q8755886.
- Q809109 abstract "The Barry Way is a partly unsealed alpine road running from Jindabyne southwest to the Victorian border, where it becomes the Snowy River Road. It eventually leads to Buchan, a total distance of 170 kilometres with no services or towns. It is sealed for the first 27 kilometres from Jindabyne, becoming unsealed at Ingebirah Gap, remaining so as far as the Victorian border. The road passes through some very remote and unspoilt wilderness in the Australian Alps. The scenery along the road provides views of the Snowy River valley and the surrounding mountains. There are a number of campsites along the road, from Jacobs River southwards. During the summer months, the weather on the Barry Way can be extremely hot and the sun's rays powerful whilst in winter the road can be closed for considerable amounts of time due to heavy snowfalls and dangerous ice. At the NSW/VIC border, the Barry Way becomes known as Snowy River Road and continues southward into the Gippsland region of Victoria.The road is named after Leo Barry, president of the Snowy River Shire Council in the 1950s, who pushed for the creation of the road.Construction of the Victorian portion of the road began as early as 1925 when a bridge was built over the Buchan River at Buchan. In the 1930s with the use of unemployed labourers, improvements were made to the Buchan -Gelantipy portion of the road. Work had progressed as far as the construction of the bridge over the Suggan Buggan River at Suggan Buggan when the start of the Second World War stopped work in 1939. All of the work completed up to this point in time was done using picks and shovels, with bullock teams employed to cart away the fill. All the stonework for the culverts, pipes and embankments was constructed by hand using stone recovered during the road making process. It was not until 1960 that the Tambo and Snowy River shires managed to secure funding to complete what was described as a jeep track (that would later be upgraded) connecting the Victorian and NSW sections built before the war. A Mr L. Livingstone was contracted to undertake the Victorian portion from Suggan Buggan to Willis on the Victorian-NSW border. The job took 26 weeks to complete with the Victorians reaching the border shortly before the New South Wales construction crew. The road was opened in May 1961 by Leo Barry (Snowy River Shire) and Keith Rogers (Tambo Shire), with some 400 people in attendance. Avalanche Lookout was constructed in these works.".
- Q809109 country Q408.
- Q809109 length "71600.0".
- Q809109 thumbnail Barry_Way_Jindabyne_Stevage.jpeg?width=300.
- Q809109 wikiPageExternalLink search.pl?mode=place_detail;place_id=101842.
- Q809109 wikiPageWikiLink Q1020373.
- Q809109 wikiPageWikiLink Q13264666.
- Q809109 wikiPageWikiLink Q1327255.
- Q809109 wikiPageWikiLink Q1526531.
- Q809109 wikiPageWikiLink Q1755161.
- Q809109 wikiPageWikiLink Q3224.
- Q809109 wikiPageWikiLink Q36687.
- Q809109 wikiPageWikiLink Q390226.
- Q809109 wikiPageWikiLink Q474545.
- Q809109 wikiPageWikiLink Q498876.
- Q809109 wikiPageWikiLink Q669923.
- Q809109 wikiPageWikiLink Q8513681.
- Q809109 wikiPageWikiLink Q8755886.
- Q809109 length "71.6".
- Q809109 roadName "Barry Way".
- Q809109 point "-36.483333333333334 148.56666666666666".
- Q809109 type Place.
- Q809109 type ArchitecturalStructure.
- Q809109 type Infrastructure.
- Q809109 type Location.
- Q809109 type Place.
- Q809109 type Road.
- Q809109 type RouteOfTransportation.
- Q809109 type Thing.
- Q809109 type SpatialThing.
- Q809109 type Q34442.
- Q809109 comment "The Barry Way is a partly unsealed alpine road running from Jindabyne southwest to the Victorian border, where it becomes the Snowy River Road. It eventually leads to Buchan, a total distance of 170 kilometres with no services or towns. It is sealed for the first 27 kilometres from Jindabyne, becoming unsealed at Ingebirah Gap, remaining so as far as the Victorian border. The road passes through some very remote and unspoilt wilderness in the Australian Alps.".
- Q809109 label "Barry Way".
- Q809109 lat "-36.483333333333334".
- Q809109 long "148.56666666666666".
- Q809109 depiction Barry_Way_Jindabyne_Stevage.jpeg.
- Q809109 name "Barry Way".