Matches in DBpedia 2016-04 for { <http://wikidata.dbpedia.org/resource/Q7567846> ?p ?o }
Showing triples 1 to 29 of
29
with 100 triples per page.
- Q7567846 subject Q9933166.
- Q7567846 abstract "Network Rail's (NR) South London Route Utilisation Strategy (SLRUS), published in March 2008 (SLRUS) was the eighth Route Utilisation Strategy to be produced. By default, RUSs are established by the Office of Rail Regulation (ORR) unless the latter objects within 60 days. The RUS is included in NR's map as established.The scope includes the London suburban lines of Strategic Route 1 - Kent, including lines as far as Hayes, Sevenoaks and Rochester (but excluding the Swanley-Rochester line) and those of Route 2 - Brighton Main Line and Sussex, including lines as far as Horsham (via Dorking), Epsom Downs, Purley (plus the branches to Tattenham Corner and Caterham), East Grinstead and Uckfield. Where routes are four-tracked the fast lines are generally excluded. As such the routes are heavily short/medium distance commuter routes into London, but there are some freight services as well. The lines excluded from Routes 1 and 2 are to be covered in the Kent RUS and the Sussex RUS.As with other RUSs, the SLRUS took into account a number of responses, including the Office of Rail Regulation (ORR).Some issues are closely related to other published RUSs: South West Main Line RUS, Cross London RUS; Freight RUS; East Coast Main Line RUS. The Strategic Rail Authority's (SRA) Brighton Main Line (BML) RUS, published February 2006, as superseded by the Department for Transport's (DfT) consultation and briefing, led to changes in the December 2008 timetable; the most important of these is the change to the Gatwick Express service in the morning peak. The Kent, Sussex and East Midlands RUSs will have some interfaces with the SLRUS.".
- Q7567846 wikiPageWikiLink Q1258373.
- Q7567846 wikiPageWikiLink Q1501071.
- Q7567846 wikiPageWikiLink Q1696490.
- Q7567846 wikiPageWikiLink Q19686.
- Q7567846 wikiPageWikiLink Q19892.
- Q7567846 wikiPageWikiLink Q20075.
- Q7567846 wikiPageWikiLink Q216360.
- Q7567846 wikiPageWikiLink Q277604.
- Q7567846 wikiPageWikiLink Q3349587.
- Q7567846 wikiPageWikiLink Q489287.
- Q7567846 wikiPageWikiLink Q5188353.
- Q7567846 wikiPageWikiLink Q5328128.
- Q7567846 wikiPageWikiLink Q5328868.
- Q7567846 wikiPageWikiLink Q5501388.
- Q7567846 wikiPageWikiLink Q6042873.
- Q7567846 wikiPageWikiLink Q682520.
- Q7567846 wikiPageWikiLink Q719530.
- Q7567846 wikiPageWikiLink Q7283930.
- Q7567846 wikiPageWikiLink Q732649.
- Q7567846 wikiPageWikiLink Q7371596.
- Q7567846 wikiPageWikiLink Q7568861.
- Q7567846 wikiPageWikiLink Q7709968.
- Q7567846 wikiPageWikiLink Q801125.
- Q7567846 wikiPageWikiLink Q831794.
- Q7567846 wikiPageWikiLink Q9933166.
- Q7567846 comment "Network Rail's (NR) South London Route Utilisation Strategy (SLRUS), published in March 2008 (SLRUS) was the eighth Route Utilisation Strategy to be produced. By default, RUSs are established by the Office of Rail Regulation (ORR) unless the latter objects within 60 days.".
- Q7567846 label "South London Route Utilisation Strategy".