- Q6939817 abstract "The Murum Dam is a gravity dam on the Murum River in the province of Sarawak on the Malaysian island of Borneo. Construction began in 2008. The dam's reservoir began to fill in July 2013 and the first generator was commissioned in December 2014. The fourth and final turbine began operations on 8 June 2015. Concerns have been raised about the displacement of the Dayak people and the removal of rainforest due to the construction of the dam.The dam site is located on the Murum River, which is in the uppermost part of the Rajang River basin, 200 km (124 mi) from Bintulu. The upstream of Rajang river includes four steps, which are Pelagus, Bakun, Murum, and Belaga. The Murum Hydroelectric Project is the second Step-Hydroelectric Project of the four steps, and is 70 km (43 mi) from the constructing Bakun Hydroelectric Project downstream.".
- Q6939817 buildingStartDate "2008".
- Q6939817 buildingStartYear "2008".
- Q6939817 description "Gravity,roller-compacted concrete".
- Q6939817 height "141.0".
- Q6939817 length "473.0".
- Q6939817 location Q170462.
- Q6939817 location Q36117.
- Q6939817 openingYear "2014".
- Q6939817 status "O".
- Q6939817 wikiPageWikiLink Q11700354.
- Q6939817 wikiPageWikiLink Q163712.
- Q6939817 wikiPageWikiLink Q170462.
- Q6939817 wikiPageWikiLink Q18810208.
- Q6939817 wikiPageWikiLink Q217817.
- Q6939817 wikiPageWikiLink Q22029180.
- Q6939817 wikiPageWikiLink Q25236.
- Q6939817 wikiPageWikiLink Q2547687.
- Q6939817 wikiPageWikiLink Q3497167.
- Q6939817 wikiPageWikiLink Q36117.
- Q6939817 wikiPageWikiLink Q7423418.
- Q6939817 wikiPageWikiLink Q8324444.
- Q6939817 wikiPageWikiLink Q8360665.
- Q6939817 wikiPageWikiLink Q847603.
- Q6939817 wikiPageWikiLink Q8499097.
- Q6939817 wikiPageWikiLink Q8529314.
- Q6939817 constructionBegan "2008".
- Q6939817 damType "Gravity, roller-compacted concrete".
- Q6939817 location Q170462.
- Q6939817 location Q36117.
- Q6939817 name "Murum Dam".
- Q6939817 opening "2014".
- Q6939817 plantCapacity "944.0".
- Q6939817 plantCommission "2014".
- Q6939817 plantName "Muram Hydroelectric Power Station".
- Q6939817 plantTurbines "4".
- Q6939817 status "O".
- Q6939817 point "2.6466666666666665 114.36583333333333".
- Q6939817 type Place.
- Q6939817 type ArchitecturalStructure.
- Q6939817 type Dam.
- Q6939817 type Infrastructure.
- Q6939817 type Location.
- Q6939817 type Place.
- Q6939817 type Thing.
- Q6939817 type SpatialThing.
- Q6939817 type Q12323.
- Q6939817 comment "The Murum Dam is a gravity dam on the Murum River in the province of Sarawak on the Malaysian island of Borneo. Construction began in 2008. The dam's reservoir began to fill in July 2013 and the first generator was commissioned in December 2014. The fourth and final turbine began operations on 8 June 2015.".
- Q6939817 label "Murum Dam".
- Q6939817 lat "2.6466666666666665".
- Q6939817 long "114.36583333333333".
- Q6939817 name "Murum Dam".