Matches in DBpedia 2016-04 for { <http://wikidata.dbpedia.org/resource/Q5323847> ?p ?o }
Showing triples 1 to 13 of
13
with 100 triples per page.
- Q5323847 subject Q4057258.
- Q5323847 subject Q5646658.
- Q5323847 abstract ""Engineering, procurement, and construction management" (EPCM) is a common form of contracting arrangement for very large projects within the infrastructure, mining, resources and energy industries. In an EPCM arrangement, the client selects a head contractor who manages the whole project on behalf of the client. The EPCM contractor coordinates all design, procurement and construction work and ensures that the whole project is completed as required and in time. The EPCM contractor may or may not undertake actual site work.An EPCM contract is a natural progression for an EPC contractor as, if one is able to do an EPC of a project, then getting a bigger EPCM job is advantageous. It helps to tap the already present competencies while ensuring better control over the project.Normally, an EPCM contractor completes the basic work such as site surveys, getting clearances from authorities, doing the basic engineering and preparing the site for the subcontractors. Subcontractors are chosen by the EPCM company, but they have an agreement directly with the final customer".
- Q5323847 wikiPageWikiLink Q121359.
- Q5323847 wikiPageWikiLink Q16923572.
- Q5323847 wikiPageWikiLink Q17044341.
- Q5323847 wikiPageWikiLink Q2151621.
- Q5323847 wikiPageWikiLink Q4057258.
- Q5323847 wikiPageWikiLink Q44497.
- Q5323847 wikiPageWikiLink Q5646658.
- Q5323847 wikiPageWikiLink Q93288.
- Q5323847 comment ""Engineering, procurement, and construction management" (EPCM) is a common form of contracting arrangement for very large projects within the infrastructure, mining, resources and energy industries. In an EPCM arrangement, the client selects a head contractor who manages the whole project on behalf of the client. The EPCM contractor coordinates all design, procurement and construction work and ensures that the whole project is completed as required and in time.".
- Q5323847 label "Engineering, procurement, and construction management".