Matches in DBpedia 2016-04 for { <http://wikidata.dbpedia.org/resource/Q5244111> ?p ?o }
Showing triples 1 to 62 of
62
with 100 triples per page.
- Q5244111 subject Q13288190.
- Q5244111 subject Q8320481.
- Q5244111 subject Q8442049.
- Q5244111 subject Q9082585.
- Q5244111 abstract "The DeSoto Next Generation Solar Energy Center is a photovoltaic solar power facility in Arcadia, DeSoto County, Florida owned by Florida Power & Light (FPL). President Barack Obama attended the plant's commissioning on October 27, 2009. It has a nameplate capacity of 25 megawatts (MW), and produces an estimated 42,000 megawatt-hours (MW·h) of electricity per year (an average output of about 4.8 MW).The plant cost $150 million to construct. The plant consists of over 90,000 SunPower solar panels with single-axis trackers on 235 acres (95 ha).FPL has to get a permit for construction of the second stage and had filed for the permit to build the third stage of the plant. At the second stage, 49 MW of capacity will be added. At the third stage, 226 MW of capacity is planned to be added bringing the total capacity of the plant up to 300 MW.".
- Q5244111 installedCapacity "2.5E7".
- Q5244111 location Q488796.
- Q5244111 location Q631415.
- Q5244111 location Q812.
- Q5244111 openingDate "2009-10-27".
- Q5244111 openingYear "2009".
- Q5244111 owner Q1430055.
- Q5244111 status "Operational".
- Q5244111 thumbnail Solar-crop.jpg?width=300.
- Q5244111 wikiPageExternalLink desoto.shtml.
- Q5244111 wikiPageWikiLink Q12069557.
- Q5244111 wikiPageWikiLink Q13288190.
- Q5244111 wikiPageWikiLink Q1430055.
- Q5244111 wikiPageWikiLink Q1483757.
- Q5244111 wikiPageWikiLink Q182098.
- Q5244111 wikiPageWikiLink Q192127.
- Q5244111 wikiPageWikiLink Q200974.
- Q5244111 wikiPageWikiLink Q25236.
- Q5244111 wikiPageWikiLink Q3246573.
- Q5244111 wikiPageWikiLink Q4120404.
- Q5244111 wikiPageWikiLink Q488796.
- Q5244111 wikiPageWikiLink Q631415.
- Q5244111 wikiPageWikiLink Q645525.
- Q5244111 wikiPageWikiLink Q7313125.
- Q5244111 wikiPageWikiLink Q7572303.
- Q5244111 wikiPageWikiLink Q76.
- Q5244111 wikiPageWikiLink Q812.
- Q5244111 wikiPageWikiLink Q8320481.
- Q5244111 wikiPageWikiLink Q8442049.
- Q5244111 wikiPageWikiLink Q9082585.
- Q5244111 commissioned "2009-10-27".
- Q5244111 location Q488796.
- Q5244111 location Q631415.
- Q5244111 location Q812.
- Q5244111 name "DeSoto Next Generation Solar Energy Center".
- Q5244111 owner Q1430055.
- Q5244111 psElectricalCapacity "25.0".
- Q5244111 psElectricalCapacity "Planned: 300 MW".
- Q5244111 status "Operational".
- Q5244111 website desoto.shtml.
- Q5244111 point "27.316666666666666 -81.8".
- Q5244111 type Place.
- Q5244111 type ArchitecturalStructure.
- Q5244111 type Infrastructure.
- Q5244111 type Location.
- Q5244111 type Place.
- Q5244111 type PowerStation.
- Q5244111 type Thing.
- Q5244111 type SpatialThing.
- Q5244111 type Q159719.
- Q5244111 comment "The DeSoto Next Generation Solar Energy Center is a photovoltaic solar power facility in Arcadia, DeSoto County, Florida owned by Florida Power & Light (FPL). President Barack Obama attended the plant's commissioning on October 27, 2009. It has a nameplate capacity of 25 megawatts (MW), and produces an estimated 42,000 megawatt-hours (MW·h) of electricity per year (an average output of about 4.8 MW).The plant cost $150 million to construct.".
- Q5244111 label "DeSoto Next Generation Solar Energy Center".
- Q5244111 lat "27.316666666666666".
- Q5244111 long "-81.8".
- Q5244111 depiction Solar-crop.jpg.
- Q5244111 homepage desoto.shtml.
- Q5244111 name "DeSoto Next Generation Solar Energy Center".