- Q4129360 abstract "The HVDC Leyte–Luzon is a high voltage direct current transmission link in the Philippines between geothermal power plants on the island of Leyte and the southern part of island of Luzon. The HVDC Leyte – Luzon went in service on 10 August 1998.The HVDC Leyte – Luzon begins at Ormoc converter station (Leyte Province) and ends at Naga converter station (Province of Camarines Sur). It consists three sections: Leyte-Samar overhead line submarine cables across San Bernardino Strait between Cabacungan (Allen, Samar) and Sta Magdalena (Sorsogon Province, Luzon) overhead line at LuzonThe length of submarine cable is 21 kilometres (13 mi) and the total length of overhead lines is 430 kilometres (270 mi). The HVDC Leyte – Luzon can transfer an output of 440 MW. It is implemented as monopolar line for a voltage of 350 kV.The crossing of San Juanico Strait is realized as overhead crossing with a tower on an island in the strait.Aim of the HVDC link is to feed the AC grid in the Manila region. Beside of overall connection of grids, the HVDC Leyte – Luzon stabilize the AC network. The interconnector is manufactured by the ABB Group in cooperation with Marubeni Corporation and it's operated by state owned National Transmission Corporation.The grounding electrodes are situated at Albuera at 10°54′01″N 124°42′24″E and near Calabanga at 13°43′59″N 123°14′29″E . They are connected with the converter stations by 25 respecitively 15 kilometres long overhead lines.".
- Q4129360 wikiPageExternalLink ABBLibrary.asp?DocumentID=POW-0021&LanguageCode=en&DocumentPartID=&Action=Launch.
- Q4129360 wikiPageExternalLink LEYTE.htm.
- Q4129360 wikiPageExternalLink c1256d71001e0037c125683400221c89.aspx.
- Q4129360 wikiPageExternalLink p129.htm.
- Q4129360 wikiPageWikiLink Q1014782.
- Q4129360 wikiPageWikiLink Q125384.
- Q4129360 wikiPageWikiLink Q127993.
- Q4129360 wikiPageWikiLink Q13260915.
- Q4129360 wikiPageWikiLink Q13767.
- Q4129360 wikiPageWikiLink Q13844.
- Q4129360 wikiPageWikiLink Q13881.
- Q4129360 wikiPageWikiLink Q1576377.
- Q4129360 wikiPageWikiLink Q174784.
- Q4129360 wikiPageWikiLink Q211377.
- Q4129360 wikiPageWikiLink Q219737.
- Q4129360 wikiPageWikiLink Q2207.
- Q4129360 wikiPageWikiLink Q2356943.
- Q4129360 wikiPageWikiLink Q370607.
- Q4129360 wikiPageWikiLink Q52825.
- Q4129360 wikiPageWikiLink Q553927.
- Q4129360 wikiPageWikiLink Q6979003.
- Q4129360 wikiPageWikiLink Q728118.
- Q4129360 wikiPageWikiLink Q8503580.
- Q4129360 wikiPageWikiLink Q8823440.
- Q4129360 wikiPageWikiLink Q928.
- Q4129360 point "11.088611111111112 124.63916666666667".
- Q4129360 type SpatialThing.
- Q4129360 comment "The HVDC Leyte–Luzon is a high voltage direct current transmission link in the Philippines between geothermal power plants on the island of Leyte and the southern part of island of Luzon. The HVDC Leyte – Luzon went in service on 10 August 1998.The HVDC Leyte – Luzon begins at Ormoc converter station (Leyte Province) and ends at Naga converter station (Province of Camarines Sur).".
- Q4129360 label "HVDC Leyte–Luzon".
- Q4129360 lat "11.088611111111112".
- Q4129360 long "124.63916666666667".