Matches in DBpedia 2016-04 for { <http://wikidata.dbpedia.org/resource/Q263572> ?p ?o }
Showing triples 1 to 68 of
68
with 100 triples per page.
- Q263572 subject Q10792785.
- Q263572 subject Q8626859.
- Q263572 abstract "Line 1 of Chongqing Rail Transit runs westwards from Chaotianmen to Daxuecheng. Line 1 begin operation on 28 July 2011.Line 1 runs 16.4 km (10.2 mi) from Chaotianmen in downtown Chongqing west to Shapingba, and eventually all the way to Shuangbei for a total length of 22.4 km (13.9 mi). It is the city's first all-heavy rail subway line and the second completed in Western China. Passenger capacity of the line is 36,000 passengers/hour/direction.In 1992, the Chongqing government had signed a Build-Operate-Transfer in 1992 with a Hong Kong company, and provided the land for the project, but work ceased in 1997 due to legal issues. Work resumed on the first stretch of the line (from Chaotianmen to Shapingba) on 9 June 2007, and opened to limited operation on July 28. An extension from Shapingba to Daxuecheng (University Town) began in 2009 and opened on December 21, 2012.Line 1 has 14 stations, including from east to west: Chaotianmen, Xiaoshizi, Jiaochangkou, Qixinggang, Lianglukou, Eling, Daping, Shiyoulu, Xietaizi, Shiqiaopu, Gaomiaocun, Majiayan, Xiaolongkan, and Shapingba stations. Lieshimu, Ciqikou, Shuangpingnan, Shuangpingbei, Laijiaqiao, Tuzhu, Huxi, Daxuecheng (University Town), and Jiandingpo stations are scheduled to open in 2013 once the Phase 2 extension of Line 1 is complete.Line 1 has transfer interchange stations with Line 2 at Jiaochangkou in Jeifangbei CBD and at Daping. Line 1 will have transfer station when Line 3 opens later in 2011 at Lianglukou, near the Chongqing Railway Station in the Caiyuanba section of central Yuzhong.".
- Q263572 isPartOf Q1190894.
- Q263572 lineLength "38900.0".
- Q263572 numberOfStations "23".
- Q263572 openingDate "2011-07-28".
- Q263572 openingYear "2011".
- Q263572 passengersPerDay "574000".
- Q263572 routeEnd Q10566675.
- Q263572 routeStart Q10566667.
- Q263572 speedLimit "100.0".
- Q263572 thumbnail 重庆轨道交通1号线_粉色红色涂装车辆混用_此为1号线标志红色车辆1.JPG?width=300.
- Q263572 type Q5503.
- Q263572 wikiPageWikiLink Q10566663.
- Q263572 wikiPageWikiLink Q10566665.
- Q263572 wikiPageWikiLink Q10566667.
- Q263572 wikiPageWikiLink Q10566670.
- Q263572 wikiPageWikiLink Q10566672.
- Q263572 wikiPageWikiLink Q10566675.
- Q263572 wikiPageWikiLink Q10566678.
- Q263572 wikiPageWikiLink Q10566680.
- Q263572 wikiPageWikiLink Q10566683.
- Q263572 wikiPageWikiLink Q10630963.
- Q263572 wikiPageWikiLink Q10632431.
- Q263572 wikiPageWikiLink Q10632596.
- Q263572 wikiPageWikiLink Q10669767.
- Q263572 wikiPageWikiLink Q10792785.
- Q263572 wikiPageWikiLink Q10858538.
- Q263572 wikiPageWikiLink Q10858539.
- Q263572 wikiPageWikiLink Q10858541.
- Q263572 wikiPageWikiLink Q10858542.
- Q263572 wikiPageWikiLink Q10858543.
- Q263572 wikiPageWikiLink Q10858544.
- Q263572 wikiPageWikiLink Q10858546.
- Q263572 wikiPageWikiLink Q10858548.
- Q263572 wikiPageWikiLink Q1190894.
- Q263572 wikiPageWikiLink Q185614.
- Q263572 wikiPageWikiLink Q5503.
- Q263572 wikiPageWikiLink Q588451.
- Q263572 wikiPageWikiLink Q596229.
- Q263572 wikiPageWikiLink Q6119227.
- Q263572 wikiPageWikiLink Q713343.
- Q263572 wikiPageWikiLink Q713728.
- Q263572 wikiPageWikiLink Q831675.
- Q263572 wikiPageWikiLink Q836612.
- Q263572 wikiPageWikiLink Q8626859.
- Q263572 wikiPageWikiLink Q8646.
- Q263572 wikiPageWikiLink Q986869.
- Q263572 end Q10566675.
- Q263572 open "2011-07-28".
- Q263572 ridership "574000".
- Q263572 start Q10566667.
- Q263572 stations "23".
- Q263572 system Q1190894.
- Q263572 type Q5503.
- Q263572 type Place.
- Q263572 type ArchitecturalStructure.
- Q263572 type Infrastructure.
- Q263572 type Location.
- Q263572 type Place.
- Q263572 type RailwayLine.
- Q263572 type RouteOfTransportation.
- Q263572 type Thing.
- Q263572 type Q728937.
- Q263572 comment "Line 1 of Chongqing Rail Transit runs westwards from Chaotianmen to Daxuecheng. Line 1 begin operation on 28 July 2011.Line 1 runs 16.4 km (10.2 mi) from Chaotianmen in downtown Chongqing west to Shapingba, and eventually all the way to Shuangbei for a total length of 22.4 km (13.9 mi). It is the city's first all-heavy rail subway line and the second completed in Western China.".
- Q263572 label "Line 1, Chongqing Rail Transit".
- Q263572 depiction 重庆轨道交通1号线_粉色红色涂装车辆混用_此为1号线标志红色车辆1.JPG.