- Q21159726 abstract "The Reventazón Dam is a concrete-face rock-fill dam currently being constructed on the Reventazón River about 8 km (5.0 mi) southwest of Siquirres in Limón Province, Costa Rica. The primary purpose of the dam is hydroelectric power production and its power station will have an installed capacity of 296 MW, the largest in the country. Construction on the dam began in 2009 and it is expected to be complete in 2016. At a height of 130 m (430 ft) and with a structural volume of 9,000,000 m3 (12,000,000 cu yd), it will be the largest dam in Central America. To produce electricity, water from the reservoir is diverted about 3 km (1.9 mi) to the northeast where it reaches the power station along the Reventazón River.".
- Q21159726 buildingStartDate "2009".
- Q21159726 buildingStartYear "2009".
- Q21159726 country Q800.
- Q21159726 description "Embankment, concrete-face rock-fill".
- Q21159726 height "130.0".
- Q21159726 length "527.0".
- Q21159726 location Q3961977.
- Q21159726 location Q642644.
- Q21159726 openingYear "2016".
- Q21159726 owner Q3431114.
- Q21159726 purpose "Power".
- Q21159726 river Q11997691.
- Q21159726 status "UC".
- Q21159726 volume "9000000.0".
- Q21159726 wikiPageWikiLink Q11997691.
- Q21159726 wikiPageWikiLink Q12323.
- Q21159726 wikiPageWikiLink Q15957127.
- Q21159726 wikiPageWikiLink Q217817.
- Q21159726 wikiPageWikiLink Q25236.
- Q21159726 wikiPageWikiLink Q27611.
- Q21159726 wikiPageWikiLink Q3431114.
- Q21159726 wikiPageWikiLink Q3961977.
- Q21159726 wikiPageWikiLink Q642644.
- Q21159726 wikiPageWikiLink Q7684292.
- Q21159726 wikiPageWikiLink Q800.
- Q21159726 wikiPageWikiLink Q80638.
- Q21159726 wikiPageWikiLink Q8360937.
- Q21159726 wikiPageWikiLink Q8408779.
- Q21159726 wikiPageWikiLink Q8414436.
- Q21159726 wikiPageWikiLink Q8529279.
- Q21159726 wikiPageWikiLink Q8797952.
- Q21159726 constructionBegan "2009".
- Q21159726 country "Costa Rica".
- Q21159726 damCrosses Q11997691.
- Q21159726 damType "Embankment, concrete-face rock-fill".
- Q21159726 location Q3961977.
- Q21159726 location Q642644.
- Q21159726 name "Reventazón Dam".
- Q21159726 opening "2016".
- Q21159726 owner Q3431114.
- Q21159726 plantCapacity "296.0".
- Q21159726 plantCommission "2016".
- Q21159726 plantName "Reventazón Hydropower Plant".
- Q21159726 plantTurbines "3".
- Q21159726 plantType "Conventional, diversion".
- Q21159726 purpose "Power".
- Q21159726 status "UC".
- Q21159726 point "10.065569444444444 -83.58021944444444".
- Q21159726 type Place.
- Q21159726 type ArchitecturalStructure.
- Q21159726 type Dam.
- Q21159726 type Infrastructure.
- Q21159726 type Location.
- Q21159726 type Place.
- Q21159726 type Thing.
- Q21159726 type SpatialThing.
- Q21159726 type Q12323.
- Q21159726 comment "The Reventazón Dam is a concrete-face rock-fill dam currently being constructed on the Reventazón River about 8 km (5.0 mi) southwest of Siquirres in Limón Province, Costa Rica. The primary purpose of the dam is hydroelectric power production and its power station will have an installed capacity of 296 MW, the largest in the country. Construction on the dam began in 2009 and it is expected to be complete in 2016.".
- Q21159726 label "Reventazón Dam".
- Q21159726 lat "10.065569444444444".
- Q21159726 long "-83.58021944444444".
- Q21159726 name "Reventazón Dam".