- Q18712236 abstract "The Félou Hydroelectric Plant, is a hydroelectric installation at the Félou Falls on the Sénégal River in Mali. It has three turbines capable of generating 62.3 MW. The current power station replaced an older one built in the 1920s. Construction of the new power station began in October 2009 and was financed by the World Bank. It is the third Senegal River Basin Development Authority project on the river and was completed in 2014. The existing weir was refurbished with the previous 2 metres (6.6 ft) height maintained. In 1927, the previous hydroelectric power station was commissioned. It was refurbished in 1992 and had an installed capacity of 600 kW.At maximum output the three 21 MW turbines pass a total of 500 cubic metres per second (18,000 cu ft/s) of water. Between August and November the water flowing in the river generally exceeds this value allowing the plant to operate at full capacity and the excess water to pass over the weir. During the dry season (December to July) the electricity generated is reduced to about a third of the maximum output as the flow of water is limited to the 150–200 cubic metres per second (5,300–7,100 cu ft/s) released from the Manantali Dam.The total estimated cost is 242 million US dollars. The construction of the plant was completed in 2014.".
- Q18712236 buildingStartDate "2009".
- Q18712236 buildingStartYear "2009".
- Q18712236 country Q912.
- Q18712236 description "Weir".
- Q18712236 height "2.0".
- Q18712236 length "945.0".
- Q18712236 location Q332113.
- Q18712236 openingYear "1927".
- Q18712236 purpose "Power".
- Q18712236 river Q3569.
- Q18712236 status "O".
- Q18712236 thumbnail Barrage_hydro-électrique_du_Félou.jpeg?width=300.
- Q18712236 wikiPageWikiLink Q16808848.
- Q18712236 wikiPageWikiLink Q19895188.
- Q18712236 wikiPageWikiLink Q2029890.
- Q18712236 wikiPageWikiLink Q25236.
- Q18712236 wikiPageWikiLink Q2885103.
- Q18712236 wikiPageWikiLink Q332113.
- Q18712236 wikiPageWikiLink Q3569.
- Q18712236 wikiPageWikiLink Q583804.
- Q18712236 wikiPageWikiLink Q604144.
- Q18712236 wikiPageWikiLink Q7164.
- Q18712236 wikiPageWikiLink Q8360229.
- Q18712236 wikiPageWikiLink Q8360666.
- Q18712236 wikiPageWikiLink Q8529315.
- Q18712236 wikiPageWikiLink Q8571479.
- Q18712236 wikiPageWikiLink Q8689173.
- Q18712236 wikiPageWikiLink Q8911287.
- Q18712236 wikiPageWikiLink Q912.
- Q18712236 constructionBegan "2009".
- Q18712236 country Q912.
- Q18712236 damCrosses Q3569.
- Q18712236 damType "Weir".
- Q18712236 location Q332113.
- Q18712236 name "Félou Weir".
- Q18712236 nameOfficial "Félou Hydroelectric Plant".
- Q18712236 purpose "Power".
- Q18712236 status "O".
- Q18712236 point "14.35361111111111 -11.345277777777778".
- Q18712236 type Place.
- Q18712236 type ArchitecturalStructure.
- Q18712236 type Dam.
- Q18712236 type Infrastructure.
- Q18712236 type Location.
- Q18712236 type Place.
- Q18712236 type Thing.
- Q18712236 type SpatialThing.
- Q18712236 type Q12323.
- Q18712236 comment "The Félou Hydroelectric Plant, is a hydroelectric installation at the Félou Falls on the Sénégal River in Mali. It has three turbines capable of generating 62.3 MW. The current power station replaced an older one built in the 1920s. Construction of the new power station began in October 2009 and was financed by the World Bank. It is the third Senegal River Basin Development Authority project on the river and was completed in 2014.".
- Q18712236 label "Félou Hydroelectric Plant".
- Q18712236 lat "14.35361111111111".
- Q18712236 long "-11.345277777777778".
- Q18712236 depiction Barrage_hydro-électrique_du_Félou.jpeg.
- Q18712236 name "Félou Hydroelectric Plant".
- Q18712236 name "Félou Weir".