Matches in DBpedia 2016-04 for { <http://wikidata.dbpedia.org/resource/Q18712120> ?p ?o }
Showing triples 1 to 59 of
59
with 100 triples per page.
- Q18712120 subject Q18698682.
- Q18712120 subject Q8629362.
- Q18712120 abstract "Ayrılık Çeşmesi is a railway station along the newly built trans-Bosphorus Marmaray tunnel. The station is located right outside the Asian portal of the tunnel and is the current eastern terminus of the line. The Turkish State Railways (TCDD) operates trains from Ayrılık Çeşmesi to Kazlıçeşme within 6- to 10-minute intervals. Connection to the M4 line of the Istanbul Metro is available from the station.Ayrılık Çeşmesi saw 14 million boardings in 2014, making it the busiest station on the Marmaray line. The station made up 25.95% of all passenger boardings of 2014.".
- Q18712120 isHandicappedAccessible "true".
- Q18712120 numberOfTracks "2".
- Q18712120 openingDate "2013-10-29".
- Q18712120 openingYear "2013".
- Q18712120 otherServingLines "M4,İETTbus".
- Q18712120 owner Q499967.
- Q18712120 owningOrganisation Q499967.
- Q18712120 passengersPerYear "38408".
- Q18712120 railwayPlatforms "1island platform".
- Q18712120 servingRailwayLine Q497844.
- Q18712120 stationStructure "At-grade".
- Q18712120 thumbnail Ayrilikcesmesi_marmaray.jpg?width=300.
- Q18712120 type Q499967.
- Q18712120 visitorStatisticsAsOf "2014".
- Q18712120 wikiPageWikiLink Q12813004.
- Q18712120 wikiPageWikiLink Q1412243.
- Q18712120 wikiPageWikiLink Q18698682.
- Q18712120 wikiPageWikiLink Q18712605.
- Q18712120 wikiPageWikiLink Q1880989.
- Q18712120 wikiPageWikiLink Q19611659.
- Q18712120 wikiPageWikiLink Q2725290.
- Q18712120 wikiPageWikiLink Q338082.
- Q18712120 wikiPageWikiLink Q497844.
- Q18712120 wikiPageWikiLink Q498172.
- Q18712120 wikiPageWikiLink Q499967.
- Q18712120 wikiPageWikiLink Q8629362.
- Q18712120 yearOfElectrification "0025".
- Q18712120 ada "Yes".
- Q18712120 electrified "25".
- Q18712120 line Q497844.
- Q18712120 name "Ayrılık Çeşmesi".
- Q18712120 opened "2013-10-29".
- Q18712120 other "M4, İETT bus".
- Q18712120 owned Q499967.
- Q18712120 passYear "2014".
- Q18712120 passengers "38408".
- Q18712120 platform "1".
- Q18712120 structure "At-grade".
- Q18712120 tracks "2".
- Q18712120 type "TCDD commuter rail station".
- Q18712120 point "41.0003 29.0302".
- Q18712120 type Place.
- Q18712120 type ArchitecturalStructure.
- Q18712120 type Infrastructure.
- Q18712120 type Location.
- Q18712120 type Place.
- Q18712120 type Station.
- Q18712120 type Thing.
- Q18712120 type SpatialThing.
- Q18712120 type Q719456.
- Q18712120 comment "Ayrılık Çeşmesi is a railway station along the newly built trans-Bosphorus Marmaray tunnel. The station is located right outside the Asian portal of the tunnel and is the current eastern terminus of the line. The Turkish State Railways (TCDD) operates trains from Ayrılık Çeşmesi to Kazlıçeşme within 6- to 10-minute intervals.".
- Q18712120 label "Ayrılık Çeşmesi railway station".
- Q18712120 lat "41.0003".
- Q18712120 long "29.0302".
- Q18712120 depiction Ayrilikcesmesi_marmaray.jpg.
- Q18712120 name "Ayrılık Çeşmesi".