Matches in DBpedia 2016-04 for { <http://wikidata.dbpedia.org/resource/Q17492684> ?p ?o }
Showing triples 1 to 44 of
44
with 100 triples per page.
- Q17492684 subject Q8384952.
- Q17492684 abstract "TPP Kostolac B3 is a plan to build a third unit of the Kostolac B coal fired thermal power plant which installed capacity of 350 MW. For the purposes of running the new plant, expansion of an open pit mine Drmno from 9 to 12 tons of coal annually is planned. There are already existing units Kostolac A1, A2, B1 and B2 and Drmno and Cirikovac open cast mines at the site.On 20 November 2013, Elektroprivreda Srbije, Tеrmoеlеktranе i kopovi Kostolac and Chinese corporation CMEC signed an agreement on construction. Authorities announced that the construction of the power plant is expected to begin by the end of 2014 and to be finished by 2019. Together with the existing blocks B1 and B2 the new plan will satisfy about 20% of Serbia's electricity needs. Zhang Chun, president and CEO of CMEC said that the new thermal power plant will have a positive impact on the environment, because it will comply with the emissions requirements of the European Union scheduled for 2018.".
- Q17492684 wikiPageWikiLink Q1073267.
- Q17492684 wikiPageWikiLink Q107711.
- Q17492684 wikiPageWikiLink Q12002754.
- Q17492684 wikiPageWikiLink Q12725.
- Q17492684 wikiPageWikiLink Q1285499.
- Q17492684 wikiPageWikiLink Q131123.
- Q17492684 wikiPageWikiLink Q131201.
- Q17492684 wikiPageWikiLink Q1327532.
- Q17492684 wikiPageWikiLink Q15104297.
- Q17492684 wikiPageWikiLink Q159719.
- Q17492684 wikiPageWikiLink Q1641572.
- Q17492684 wikiPageWikiLink Q1653.
- Q17492684 wikiPageWikiLink Q17098477.
- Q17492684 wikiPageWikiLink Q188844.
- Q17492684 wikiPageWikiLink Q189539.
- Q17492684 wikiPageWikiLink Q19904193.
- Q17492684 wikiPageWikiLink Q200297.
- Q17492684 wikiPageWikiLink Q200974.
- Q17492684 wikiPageWikiLink Q20665717.
- Q17492684 wikiPageWikiLink Q208202.
- Q17492684 wikiPageWikiLink Q218.
- Q17492684 wikiPageWikiLink Q24489.
- Q17492684 wikiPageWikiLink Q25236.
- Q17492684 wikiPageWikiLink Q2577882.
- Q17492684 wikiPageWikiLink Q271855.
- Q17492684 wikiPageWikiLink Q3039540.
- Q17492684 wikiPageWikiLink Q3095288.
- Q17492684 wikiPageWikiLink Q3177610.
- Q17492684 wikiPageWikiLink Q320389.
- Q17492684 wikiPageWikiLink Q403.
- Q17492684 wikiPageWikiLink Q458.
- Q17492684 wikiPageWikiLink Q49371.
- Q17492684 wikiPageWikiLink Q658255.
- Q17492684 wikiPageWikiLink Q7314803.
- Q17492684 wikiPageWikiLink Q79913.
- Q17492684 wikiPageWikiLink Q8068.
- Q17492684 wikiPageWikiLink Q836925.
- Q17492684 wikiPageWikiLink Q8384952.
- Q17492684 wikiPageWikiLink Q848507.
- Q17492684 wikiPageWikiLink Q93288.
- Q17492684 comment "TPP Kostolac B3 is a plan to build a third unit of the Kostolac B coal fired thermal power plant which installed capacity of 350 MW. For the purposes of running the new plant, expansion of an open pit mine Drmno from 9 to 12 tons of coal annually is planned.".
- Q17492684 label "TPP Kostolac B3".