Matches in DBpedia 2016-04 for { <http://wikidata.dbpedia.org/resource/Q17382397> ?p ?o }
Showing triples 1 to 51 of
51
with 100 triples per page.
- Q17382397 subject Q18067956.
- Q17382397 subject Q6616525.
- Q17382397 subject Q7010119.
- Q17382397 subject Q8326497.
- Q17382397 abstract "The Fengning Pumped Storage Power Station is a pumped-storage hydroelectric power station currently under construction about 145 km (90 mi) northwest of Chengde in Fengning Manchu Autonomous County of Hebei Province, China. Construction on the power station began in June 2013 and the first generator is expected to be commissioned in 2019, the last in 2021. Project cost is US$1.87 billion. On 1 April 2014 Gezhouba Group was awarded the main contract to build the power station. It will be constructed in two 1,800 MW phases. When complete, it will be the largest pumped-storage power station in the world with an installed capacity of 3,600 MW. The power station will operate by shifting water between an upper and lower reservoir to generate electricity. During periods of low energy demand, such as at night, water will be pumped from Fengning Lower Reservoir up to the upper reservoir. When energy demand is high, the water is released back down to the lower reservoir but the pump turbines that pumped the water up now reverse mode and serve as generators to produce electricity. The process is repeated as necessary and the plant will serve as a peaking power plant.The lower reservoir will hold up to 66,150,000 m3 (53,630 acre·ft) of water of which 41,480,000 m3 (33,630 acre·ft) can be used for power generation. The upper reservoir will withhold up to 48,830,000 m3 (39,590 acre·ft) of water of which 40,610,000 m3 (32,920 acre·ft) can be used for power generation. Water from the upper reservoir is sent to the underground power station down near the lower reservoir.".
- Q17382397 averageAnnualGeneration "5.76E12".
- Q17382397 buildingStartDate "2013".
- Q17382397 buildingStartYear "2013".
- Q17382397 installedCapacity "3.6E9".
- Q17382397 location Q1331582.
- Q17382397 location Q21208.
- Q17382397 openingYear "2019".
- Q17382397 status "UC".
- Q17382397 wikiPageWikiLink Q1331582.
- Q17382397 wikiPageWikiLink Q1664208.
- Q17382397 wikiPageWikiLink Q18067956.
- Q17382397 wikiPageWikiLink Q1864231.
- Q17382397 wikiPageWikiLink Q18979989.
- Q17382397 wikiPageWikiLink Q21208.
- Q17382397 wikiPageWikiLink Q217817.
- Q17382397 wikiPageWikiLink Q25236.
- Q17382397 wikiPageWikiLink Q339353.
- Q17382397 wikiPageWikiLink Q5555081.
- Q17382397 wikiPageWikiLink Q58675.
- Q17382397 wikiPageWikiLink Q6616525.
- Q17382397 wikiPageWikiLink Q7010119.
- Q17382397 wikiPageWikiLink Q80638.
- Q17382397 wikiPageWikiLink Q8326497.
- Q17382397 commissioned "2019".
- Q17382397 constructionBegan "2013".
- Q17382397 location Q1331582.
- Q17382397 location Q21208.
- Q17382397 name "Fengning Pumped Storage Power Station".
- Q17382397 psAnnualGeneration "1600000.0".
- Q17382397 psElectricalCapacity "3600.0".
- Q17382397 status "UC".
- Q17382397 point "41.66620833333333 116.52878611111112".
- Q17382397 type Place.
- Q17382397 type ArchitecturalStructure.
- Q17382397 type Infrastructure.
- Q17382397 type Location.
- Q17382397 type Place.
- Q17382397 type PowerStation.
- Q17382397 type Thing.
- Q17382397 type SpatialThing.
- Q17382397 type Q159719.
- Q17382397 comment "The Fengning Pumped Storage Power Station is a pumped-storage hydroelectric power station currently under construction about 145 km (90 mi) northwest of Chengde in Fengning Manchu Autonomous County of Hebei Province, China. Construction on the power station began in June 2013 and the first generator is expected to be commissioned in 2019, the last in 2021. Project cost is US$1.87 billion. On 1 April 2014 Gezhouba Group was awarded the main contract to build the power station.".
- Q17382397 label "Fengning Pumped Storage Power Station".
- Q17382397 lat "41.66620833333333".
- Q17382397 long "116.52878611111112".
- Q17382397 name "Fengning Pumped Storage Power Station".