Matches in DBpedia 2016-04 for { <http://wikidata.dbpedia.org/resource/Q16949749> ?p ?o }
Showing triples 1 to 80 of
80
with 100 triples per page.
- Q16949749 subject Q7484901.
- Q16949749 subject Q7787149.
- Q16949749 subject Q8294199.
- Q16949749 subject Q8326506.
- Q16949749 subject Q8421901.
- Q16949749 subject Q8432650.
- Q16949749 subject Q8571730.
- Q16949749 abstract "M7, officially referred to as the M7 Kabataş–Mahmutbey line (Turkish: M7 Kabataş–Mahmutbey metro hattı) is a rapid transit line of the İstanbul Metro system on the European part of Istanbul, Turkey. Currently, it is under construction. On December 20, 2013, the line was commissioned to Kalyon Group for construction. The groundbreaking ceremony was held on February 9, 2014. The line will be 18-kilometre (11 mi) long with 15 stations, and is expected to go into service in 2017.".
- Q16949749 isPartOf Q498172.
- Q16949749 lineLength "24500.0".
- Q16949749 location Q406.
- Q16949749 numberOfStations "18".
- Q16949749 numberOfTracks "2".
- Q16949749 openingYear "2017".
- Q16949749 routeEnd Q746516.
- Q16949749 routeStart Q1775810.
- Q16949749 status "Under construction".
- Q16949749 thumbnail Istanbul_Line_Symbol_M7.png?width=300.
- Q16949749 type Q5503.
- Q16949749 typeOfElectrification Q110701.
- Q16949749 voltageOfElectrification "1500.0".
- Q16949749 wikiPageWikiLink Q110701.
- Q16949749 wikiPageWikiLink Q13418161.
- Q16949749 wikiPageWikiLink Q1393228.
- Q16949749 wikiPageWikiLink Q1728883.
- Q16949749 wikiPageWikiLink Q1775810.
- Q16949749 wikiPageWikiLink Q1865363.
- Q16949749 wikiPageWikiLink Q1880934.
- Q16949749 wikiPageWikiLink Q1880963.
- Q16949749 wikiPageWikiLink Q269182.
- Q16949749 wikiPageWikiLink Q2791622.
- Q16949749 wikiPageWikiLink Q284489.
- Q16949749 wikiPageWikiLink Q2905397.
- Q16949749 wikiPageWikiLink Q338082.
- Q16949749 wikiPageWikiLink Q390637.
- Q16949749 wikiPageWikiLink Q406.
- Q16949749 wikiPageWikiLink Q459495.
- Q16949749 wikiPageWikiLink Q464780.
- Q16949749 wikiPageWikiLink Q498172.
- Q16949749 wikiPageWikiLink Q503503.
- Q16949749 wikiPageWikiLink Q5503.
- Q16949749 wikiPageWikiLink Q5626765.
- Q16949749 wikiPageWikiLink Q570826.
- Q16949749 wikiPageWikiLink Q578.
- Q16949749 wikiPageWikiLink Q603319.
- Q16949749 wikiPageWikiLink Q6088693.
- Q16949749 wikiPageWikiLink Q6088696.
- Q16949749 wikiPageWikiLink Q673073.
- Q16949749 wikiPageWikiLink Q746516.
- Q16949749 wikiPageWikiLink Q7484901.
- Q16949749 wikiPageWikiLink Q7787149.
- Q16949749 wikiPageWikiLink Q8294199.
- Q16949749 wikiPageWikiLink Q8326506.
- Q16949749 wikiPageWikiLink Q8421901.
- Q16949749 wikiPageWikiLink Q8432650.
- Q16949749 wikiPageWikiLink Q8571730.
- Q16949749 el "1500".
- Q16949749 end "Mahmutbey".
- Q16949749 linelengthKm "24.5".
- Q16949749 locale "İstanbul, Turkey".
- Q16949749 name "M7 Kabataş–Mahmutbey".
- Q16949749 notrack "2".
- Q16949749 start "Kabataş".
- Q16949749 stations "18".
- Q16949749 status "Under construction".
- Q16949749 system Q498172.
- Q16949749 type Q5503.
- Q16949749 type Place.
- Q16949749 type ArchitecturalStructure.
- Q16949749 type Infrastructure.
- Q16949749 type Location.
- Q16949749 type Place.
- Q16949749 type RailwayLine.
- Q16949749 type RouteOfTransportation.
- Q16949749 type Thing.
- Q16949749 type Q728937.
- Q16949749 comment "M7, officially referred to as the M7 Kabataş–Mahmutbey line (Turkish: M7 Kabataş–Mahmutbey metro hattı) is a rapid transit line of the İstanbul Metro system on the European part of Istanbul, Turkey. Currently, it is under construction. On December 20, 2013, the line was commissioned to Kalyon Group for construction. The groundbreaking ceremony was held on February 9, 2014. The line will be 18-kilometre (11 mi) long with 15 stations, and is expected to go into service in 2017.".
- Q16949749 label "M7 (Istanbul Metro)".
- Q16949749 depiction Istanbul_Line_Symbol_M7.png.
- Q16949749 name "M7 Kabataş–Mahmutbey".