Matches in DBpedia 2016-04 for { <http://wikidata.dbpedia.org/resource/Q1356919> ?p ?o }
Showing triples 1 to 52 of
52
with 100 triples per page.
- Q1356919 subject Q8360865.
- Q1356919 subject Q8360937.
- Q1356919 subject Q8529366.
- Q1356919 subject Q8797952.
- Q1356919 abstract "The Manuel Piar Hydroelectric Power Plant (Tocoma Dam) is under construction and it is the last hydroelectric development project in the Lower Caroní River Basin of Venezuela. The project includes the installation of 2,300 megawatts (3,100,000 hp) MW to generate an annual average energy of 12,100 gigawatt-hours (44,000 TJ). Ten Kaplan generator units, of 230 megawatts (310,000 hp), manufactured by Argentinian company IMPSA, were predicted to begin operations between 2012 and 2014. The first generator was installed but not yet commissioned in April 2012. Behind scheduled, the dam began to impound its reservoir on 16 November 2015. These units had the world record as of 2012 in power generation at nominal head for Kaplan turbines. The diameter of the runner is 8.6 metres (28 ft) and nominal head is 34.65 metres (113.7 ft) with claimed output up to 232 megawatts (311,000 hp).".
- Q1356919 buildingStartDate "2006".
- Q1356919 buildingStartYear "2006".
- Q1356919 country Q717.
- Q1356919 description "Composite, rock-fill/gravity".
- Q1356919 height "65.0".
- Q1356919 length "360.0".
- Q1356919 openingYear "2015".
- Q1356919 river Q590533.
- Q1356919 status "Under construction".
- Q1356919 wikiPageWikiLink Q213947.
- Q1356919 wikiPageWikiLink Q25236.
- Q1356919 wikiPageWikiLink Q590533.
- Q1356919 wikiPageWikiLink Q717.
- Q1356919 wikiPageWikiLink Q80638.
- Q1356919 wikiPageWikiLink Q8360865.
- Q1356919 wikiPageWikiLink Q8360937.
- Q1356919 wikiPageWikiLink Q8529366.
- Q1356919 wikiPageWikiLink Q8797952.
- Q1356919 constructionBegan "2006".
- Q1356919 country Q717.
- Q1356919 damCrosses Q590533.
- Q1356919 damLength "Concrete-face rock-fill section:".
- Q1356919 damLength "Gravity section:".
- Q1356919 damLength "Rock-fill section:".
- Q1356919 damType "Composite, rock-fill/gravity".
- Q1356919 name "Tocoma Dam".
- Q1356919 nameOfficial "Manuel Piar Hydroelectric Power Plant".
- Q1356919 opening "2015".
- Q1356919 plantCommission "2015".
- Q1356919 plantTurbines "10".
- Q1356919 status "Under construction".
- Q1356919 point "7.906944444444444 -63.02638888888889".
- Q1356919 type Place.
- Q1356919 type ArchitecturalStructure.
- Q1356919 type Dam.
- Q1356919 type Infrastructure.
- Q1356919 type Location.
- Q1356919 type Place.
- Q1356919 type Thing.
- Q1356919 type SpatialThing.
- Q1356919 type Q12323.
- Q1356919 comment "The Manuel Piar Hydroelectric Power Plant (Tocoma Dam) is under construction and it is the last hydroelectric development project in the Lower Caroní River Basin of Venezuela. The project includes the installation of 2,300 megawatts (3,100,000 hp) MW to generate an annual average energy of 12,100 gigawatt-hours (44,000 TJ). Ten Kaplan generator units, of 230 megawatts (310,000 hp), manufactured by Argentinian company IMPSA, were predicted to begin operations between 2012 and 2014.".
- Q1356919 label "Tocoma Dam".
- Q1356919 lat "7.906944444444444".
- Q1356919 long "-63.02638888888889".
- Q1356919 name "Manuel Piar Hydroelectric Power Plant".
- Q1356919 name "Tocoma Dam".