Matches in DBpedia 2016-04 for { <http://dbpedia.org/resource/Shenhua_CTL> ?p ?o }
Showing triples 1 to 45 of
45
with 100 triples per page.
- Shenhua_CTL abstract "Shenhua CTL (also known as Ningxia Hui CTL, Chinese: 神华CTL) is a planned coal liquefaction plant in Ningdong, Ningxia, China. Its planned capacity is 80,000 barrels per day (13,000 m3/d). The liquefaction plant is to use a Sasol's indirect liquefaction technology, based on the Fischer–Tropsch process.The feasibility study was carried out by Foster Wheeler and Wuhuan Engineering. The constriction is to start in October 2010 and it expected to cost US$7 billion. The project was developed by Sasol and Ningxia Coal Industry Group, a subsidiary of Shenhua Group. The agreement between companies was signed on 21 June 2006. In September 2011, Sasol pull back from the project.".
- Shenhua_CTL wikiPageID "23834576".
- Shenhua_CTL wikiPageLength "3328".
- Shenhua_CTL wikiPageOutDegree "15".
- Shenhua_CTL wikiPageRevisionID "607752234".
- Shenhua_CTL wikiPageWikiLink Category:Coal_in_China.
- Shenhua_CTL wikiPageWikiLink Category:Coal_infrastructure.
- Shenhua_CTL wikiPageWikiLink Category:Energy_infrastructure_in_China.
- Shenhua_CTL wikiPageWikiLink Category:Petroleum_production.
- Shenhua_CTL wikiPageWikiLink Category:Proposed_energy_projects.
- Shenhua_CTL wikiPageWikiLink Category:Proposed_infrastructure_in_China.
- Shenhua_CTL wikiPageWikiLink Category:Synthetic_fuel_facilities.
- Shenhua_CTL wikiPageWikiLink China.
- Shenhua_CTL wikiPageWikiLink Coal_liquefaction.
- Shenhua_CTL wikiPageWikiLink Erdos_CTL.
- Shenhua_CTL wikiPageWikiLink Fischer–Tropsch_process.
- Shenhua_CTL wikiPageWikiLink Foster_Wheeler.
- Shenhua_CTL wikiPageWikiLink Ningxia.
- Shenhua_CTL wikiPageWikiLink Sasol.
- Shenhua_CTL wikiPageWikiLink Shenhua_Group.
- Shenhua_CTL wikiPageWikiLinkText "Ningxia Hui CTL".
- Shenhua_CTL wikiPageWikiLinkText "Shenhua CTL".
- Shenhua_CTL wikiPageUsesTemplate Template:About.
- Shenhua_CTL wikiPageUsesTemplate Template:Convert.
- Shenhua_CTL wikiPageUsesTemplate Template:Coord_missing.
- Shenhua_CTL wikiPageUsesTemplate Template:Lang-zh.
- Shenhua_CTL wikiPageUsesTemplate Template:Reflist.
- Shenhua_CTL subject Category:Coal_in_China.
- Shenhua_CTL subject Category:Coal_infrastructure.
- Shenhua_CTL subject Category:Energy_infrastructure_in_China.
- Shenhua_CTL subject Category:Petroleum_production.
- Shenhua_CTL subject Category:Proposed_energy_projects.
- Shenhua_CTL subject Category:Proposed_infrastructure_in_China.
- Shenhua_CTL subject Category:Synthetic_fuel_facilities.
- Shenhua_CTL hypernym Plant.
- Shenhua_CTL type Plant.
- Shenhua_CTL type Facility.
- Shenhua_CTL type Fuel.
- Shenhua_CTL comment "Shenhua CTL (also known as Ningxia Hui CTL, Chinese: 神华CTL) is a planned coal liquefaction plant in Ningdong, Ningxia, China. Its planned capacity is 80,000 barrels per day (13,000 m3/d). The liquefaction plant is to use a Sasol's indirect liquefaction technology, based on the Fischer–Tropsch process.The feasibility study was carried out by Foster Wheeler and Wuhuan Engineering. The constriction is to start in October 2010 and it expected to cost US$7 billion.".
- Shenhua_CTL label "Shenhua CTL".
- Shenhua_CTL sameAs Q7494275.
- Shenhua_CTL sameAs m.06_xd90.
- Shenhua_CTL sameAs Q7494275.
- Shenhua_CTL wasDerivedFrom Shenhua_CTL?oldid=607752234.
- Shenhua_CTL isPrimaryTopicOf Shenhua_CTL.