Matches in DBpedia 2016-04 for { <http://dbpedia.org/resource/Salamonde_Dam> ?p ?o }
- Salamonde_Dam length "0.284".
- Salamonde_Dam abstract "Salamonde Dam (Portuguese: Barragem de Salamonde) is a concrete arch dam on the Cávado River, where the river forms the border line between the districts of Braga and Vila Real. It is located in the municipality Vieira do Minho, in Braga District, Portugal.The dam was completed in 1953. It is owned by Companhia Portuguesa de Produção de Electricidade (CPPE). The dam was designed by Coyne et Bellier.".
- Salamonde_Dam description "Concretearch dam".
- Salamonde_Dam elevation "281.0".
- Salamonde_Dam lake Salamonde_Dam__1.
- Salamonde_Dam length "284.0".
- Salamonde_Dam location Braga_District.
- Salamonde_Dam location Portugal.
- Salamonde_Dam location Vieira_do_Minho.
- Salamonde_Dam openingYear "1953".
- Salamonde_Dam purpose "Power".
- Salamonde_Dam river Cávado_River.
- Salamonde_Dam status "O".
- Salamonde_Dam volume "93000.0".
- Salamonde_Dam wikiPageExternalLink hydro-portugal.htm.
- Salamonde_Dam wikiPageID "45503922".
- Salamonde_Dam wikiPageLength "8008".
- Salamonde_Dam wikiPageOutDegree "39".
- Salamonde_Dam wikiPageRevisionID "653287834".
- Salamonde_Dam wikiPageWikiLink Alstom.
- Salamonde_Dam wikiPageWikiLink Arch_dam.
- Salamonde_Dam wikiPageWikiLink Braga_District.
- Salamonde_Dam wikiPageWikiLink Category:1953_establishments_in_Portugal.
- Salamonde_Dam wikiPageWikiLink Category:Arch_dams.
- Salamonde_Dam wikiPageWikiLink Category:Buildings_and_structures_in_Braga_District.
- Salamonde_Dam wikiPageWikiLink Category:Dams_completed_in_1953.
- Salamonde_Dam wikiPageWikiLink Category:Dams_in_Portugal.
- Salamonde_Dam wikiPageWikiLink Category:Energy_infrastructure_completed_in_1953.
- Salamonde_Dam wikiPageWikiLink Category:Hydroelectric_power_stations_in_Portugal.
- Salamonde_Dam wikiPageWikiLink Category:Underground_power_stations.
- Salamonde_Dam wikiPageWikiLink Concrete.
- Salamonde_Dam wikiPageWikiLink Coyne_et_Bellier.
- Salamonde_Dam wikiPageWikiLink Cávado_River.
- Salamonde_Dam wikiPageWikiLink Energias_de_Portugal.
- Salamonde_Dam wikiPageWikiLink Francis_turbine.
- Salamonde_Dam wikiPageWikiLink Hydraulic_head.
- Salamonde_Dam wikiPageWikiLink Hydroelectricity.
- Salamonde_Dam wikiPageWikiLink Kilowatt_hour.
- Salamonde_Dam wikiPageWikiLink List_of_dams_and_reservoirs_in_Portugal.
- Salamonde_Dam wikiPageWikiLink List_of_power_stations_in_Portugal.
- Salamonde_Dam wikiPageWikiLink Nameplate_capacity.
- Salamonde_Dam wikiPageWikiLink Portugal.
- Salamonde_Dam wikiPageWikiLink Pumped-storage_hydroelectricity.
- Salamonde_Dam wikiPageWikiLink Spillway.
- Salamonde_Dam wikiPageWikiLink Vieira_do_Minho.
- Salamonde_Dam wikiPageWikiLink Vila_Real_District.
- Salamonde_Dam wikiPageWikiLink Voith.
- Salamonde_Dam wikiPageWikiLink Volt-ampere.
- Salamonde_Dam wikiPageWikiLink Watt.
- Salamonde_Dam wikiPageWikiLinkText "Sal.".
- Salamonde_Dam wikiPageWikiLinkText "Salamonde Dam".
- Salamonde_Dam wikiPageWikiLinkText "Salamonde".
- Salamonde_Dam coordinatesDisplay "inline,title".
- Salamonde_Dam coordinatesType "type:landmark_region:PT".
- Salamonde_Dam damCrosses Cávado_River.
- Salamonde_Dam damType Arch_dam.
- Salamonde_Dam damType Concrete.
- Salamonde_Dam latD "41".
- Salamonde_Dam latM "41".
- Salamonde_Dam latNs "N".
- Salamonde_Dam latS "30.6".
- Salamonde_Dam location "municipality Vieira do Minho, Braga District, Portugal".
- Salamonde_Dam locationMap "Portugal".
- Salamonde_Dam longD "8".
- Salamonde_Dam longEw "W".
- Salamonde_Dam longM "5".
- Salamonde_Dam longS "28.5".
- Salamonde_Dam name "Salamonde Dam".
- Salamonde_Dam nameOfficial "Barragem de Salamonde".
- Salamonde_Dam opening "1953".
- Salamonde_Dam owner "Companhia Portuguesa de Produção de Electricidade".
- Salamonde_Dam plantAnnualGen "Salamonde I: 231.2 GWh".
- Salamonde_Dam plantAnnualGen "Salamonde II: 386 GWh".
- Salamonde_Dam plantCapacity "Salamonde I: 42 MW".
- Salamonde_Dam plantCapacity "Salamonde II: 207 MW".
- Salamonde_Dam plantCommission "Salamonde I: 1953".
- Salamonde_Dam plantCommission "Salamonde II: 2015".
- Salamonde_Dam plantHydraulicHead "Salamonde I:".
- Salamonde_Dam plantHydraulicHead "Salamonde II: ?".
- Salamonde_Dam plantOperator Energias_de_Portugal.
- Salamonde_Dam plantTurbines "Salamonde I: 2 x 21.8 MW Francis-type".
- Salamonde_Dam plantTurbines "Salamonde II: 1 x 207 MW Francis-type".
- Salamonde_Dam purpose "Power".
- Salamonde_Dam spillwayType "Over the dam".
- Salamonde_Dam status "O".
- Salamonde_Dam wikiPageUsesTemplate Template:Cite_web.
- Salamonde_Dam wikiPageUsesTemplate Template:Convert.
- Salamonde_Dam wikiPageUsesTemplate Template:Infobox_dam.
- Salamonde_Dam wikiPageUsesTemplate Template:Lang-pt.
- Salamonde_Dam wikiPageUsesTemplate Template:Reflist.
- Salamonde_Dam subject Category:1953_establishments_in_Portugal.
- Salamonde_Dam subject Category:Arch_dams.
- Salamonde_Dam subject Category:Buildings_and_structures_in_Braga_District.
- Salamonde_Dam subject Category:Dams_completed_in_1953.
- Salamonde_Dam subject Category:Dams_in_Portugal.
- Salamonde_Dam subject Category:Energy_infrastructure_completed_in_1953.
- Salamonde_Dam subject Category:Hydroelectric_power_stations_in_Portugal.
- Salamonde_Dam subject Category:Underground_power_stations.
- Salamonde_Dam hypernym Dam.
- Salamonde_Dam point "41.691833333333335 -8.09125".